FIELD: construction.
SUBSTANCE: invention relates to the field of bridge construction. In method of craneless installation of superstructure to head beams there are pivotally attached two spacers of required length and strength, other ends of which rest on additional pontoon; two winches and a limiter are installed on the pile grillage of the foundation; as a means of delivering a superstructure from the IMI-60 property, a floating support with the required stability is provided, with supports, which are capable of retaining the superstructure in the half-horizontal state in size. Prior to installation of superstructure, floating platform is assembled from IMI-60. Supports are installed on the support. Crane from shore to floating support in semi-horizontal state superstructure is installed from property IMI-60 with two struts hinged to head beams, other ends of braces are fixed for additional pontoons. A winch and a limiter are installed on the grillage of the pile foundation. When floating platform with superstructure from IMI-60 approaches grid of pile foundation to lower ends of braces, ends of winches cable are attached. When winch limiter hits, traction force is caused, and superstructure changes from semi-horizontal to vertical state. After installation of superstructure in vertical state braces are disconnected.
EFFECT: possibility of craneless installation of superstructure on grillage pile foundation without separation of head beams and grillage.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SELF-SUPPORTING FOUNDATION | 2016 |
|
RU2636835C1 |
METHOD TO DELIVER SUPERSTRUCTURE OF SUPPORT USING SOFT PONTOONS | 2019 |
|
RU2737746C1 |
SCAFFOLD FOR BRIDGE SPAN STRUCTURE MOUNTING | 2004 |
|
RU2275455C2 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
PROTECTIVE CASE FOR BRIDGE PIER GRILLAGE AND ERECTION METHOD THEREOF | 2004 |
|
RU2263176C1 |
METHOD FOR DOCKING OF RIVER PARTS OF FLOATING BRIDGES MLZH-VF-VT AND NZHM-56 | 2018 |
|
RU2692363C1 |
UNIVERSAL DISMOUNTABLE ICE CUTTER | 2020 |
|
RU2746339C1 |
VEHICLE | 2022 |
|
RU2786744C1 |
APPARATUS FOR CONSTRUCTING BRIDGE PIER FOUNDATION | 0 |
|
SU992658A1 |
Authors
Dates
2019-11-15—Published
2018-07-11—Filed