METHOD OF DETERMINING FORMATION HYDRAULIC FRACTURING PARAMETERS Russian patent published in 2020 - IPC E21B43/26 

Abstract RU 2725996 C1

FIELD: mining.

SUBSTANCE: invention relates to hydraulic fracturing of reservoirs and can be used in determining parameters used in process of calculation and analysis of operations during intensification of fluid inflow from formation, in particular, when determining fracture closing pressure and fracture pressure during hydraulic fracturing of formation (HF). Method comprises pumping of hydraulic fracturing fluid into formation to create hydraulic fracture, recording pressure and supply; stopping pumping of liquid into formation, recording pressure drop; obtaining a set of pressure change data in the well before, during and after pumping of liquid; loading in HF and visualization of data of pressure change in format of graphs of dependence of pressure in well from time; determination of approximate value of instant pressure of ISIP pumping stopping; displaying data of pressure variation and semi-logarithmic derivative of pressure on diagnostic Log-Log graph; identification of the mode of linear flow of the hydraulic fracturing fluid in the fracture and presence or absence of the mode of secondary influence of the well shaft; correcting the diagnostic Log-Log graph by bringing it to a normalized form by searching for an ISIP value such that the curve ΔP and semi-logarithmic derivative at section of linear flow of liquid in fracture are parallel to each other, tangent of angle of inclination of tangent to both curves is ½ and values ΔP twice more than semi-logarithmic derivative values; determining crack closing time using a normalized Log-Log diagnostic graph, wherein in case of identified mode of secondary influence of well shaft as time of closing of crack is selected initial divergence of semi-logarithmic derivative with straight line with tangent of inclination to axis OX, equal to 1, and in case of absence of identified mode of secondary influence of barrel as closing time of crack is selected initial divergence of semi-logarithmic derivative with straight line with tangent of inclination to axis OX, equal to ½; determination of closing pressure of crack Pcl using graphs of function of leaks of hydraulic fracturing fluid at moment of crack closing time; determination of pressure in fracture Pnet.

EFFECT: technical result is higher accuracy of determining parameters of hydraulic fracturing.

6 cl, 6 dwg

Similar patents RU2725996C1

Title Year Author Number
METHOD FOR DETERMINING ZONES OF DEVELOPMENT OF CRACKS IN MULTI-STAGE HYDRAULIC FRACTURING 2022
  • Badazhkov Dmitrii Viktorovich
RU2796265C1
METHOD OF OIL AND GAS PRODUCTION USING DETERMINATION OF FRACTURE DEVELOPMENT ZONES OF MULTI-STAGE HYDRAULIC FRACTURING 2023
  • Badazhkov Dmitrij Viktorovich
RU2819060C1
METHOD OF DIAGNOSTICS AND QUANTITATIVE ESTIMATION OF NON-PRODUCTIVE INJECTION IN INJECTION WELLS WITH UNSTABLE CRACKS OF AUTO-HF 2019
  • Khaliullin Farit Fandatovich
  • Ipatov Andrej Ivanovich
  • Kremenetskij Mikhail Izrailevich
  • Musaleev Kharis Zakarievich
RU2728032C1
DETERMINING METHOD FOR PARAMETERS OF FORMATION NEAR ZONE 2017
  • Pityuk Yuliya Ajratovna
  • Davletbaev Alfred Yadgarovich
  • Musin Ajrat Akhmatovich
  • Kovaleva Liana Aronovna
  • Marin Dmitrij Fagimovich
RU2651647C1
METHOD FOR HYDRAULIC FRACTURING OF OIL, GAS OR GAS CONDENSATE FORMATION 2019
  • Yumasheva Tatyana Modestovna
  • Afanasev Vladimir Vladimirovich
  • Bespalova Natalya Borisovna
  • Lovkov Sergej Sergeevich
  • Shutko Egor Vladimirovich
  • Kiselev Igor Alekseevich
  • Pestrikov Aleksej Vladimirovich
  • Toropov Konstantin Vitalevich
  • Matveev Sergej Nikolaevich
  • Kudrya Semen Sergeevich
  • Evseev Oleg Vladimirovich
RU2723806C1
METHOD FOR REPEATED MULTISTAGE HYDRAULIC FRACTURING WITH DIVERTING PACKS IN HORIZONTAL WELL 2022
  • Mingazov Artur Failovich
  • Samojlov Ivan Sergeevich
  • Menshenin Mikhail Mikhajlovich
  • Sokolov Dmitrij Sergeevich
RU2808396C1
CONTROLLING FRACTURING OPERATIONS 2019
  • Mu, Nan
  • Weng, Xiaowei
  • Lesko, Timothy Michael
  • Matthews, James
  • Kajita, Marcos Suguru
  • Mi, Bao
  • Bagulayan, Amal
  • Daube, Francois
  • Hobbs, Brandon Travis
  • Kuhn De Chizelle, Yan P.
  • Menasria, Samir
  • Ho, Kevin
RU2776140C1
BALANCE CONTROLLER IN THE PUMP STOCK DURING FRACTURING OPERATIONS 2019
  • Mu, Nan
  • Kuhn De Chizelle, Yan P.
  • Binet, Florence
  • Lee, Manbro
  • Taylor, Alexander Tanner
  • Suharik, Bryan
  • Schoene, Clare
  • Matthews, James
  • Mi, Bao
  • Anchlia, Muktabh
RU2776144C1
METHOD FOR TEMPORARY ISOLATION OF WELL INTERVAL, METHOD OF REPEATED HYDRAULIC FRACTURING OF FORMATION AND WELL KILLING METHOD 2017
  • Danilevich Elena Vladimirovna
  • Parkhonyuk Sergej Dmitrievich
  • Silko Nikita Yurevich
RU2742382C1
METHOD OF HYDRODYNAMIC INVESTIGATIONS OF INJECTION WELLS 2011
  • Kremenetskij Mikhail Izrailevich
  • Kokurina Valentina Vladimirovna
RU2473804C1

RU 2 725 996 C1

Authors

Lisitsyn Andrej Igorevich

Gajsina Narkes Rustemovna

Rumyannikova Galina Endrikhovna

Tavberidze Timur Arsenovich

Bochkarev Aleksandr Vladimirovich

Chernyshev Dmitrij Viktorovich

Dates

2020-07-08Published

2019-11-25Filed