FIELD: mining.
SUBSTANCE: group of inventions relates to maintaining formation pressure at multi-layer deposits and can be used in simultaneous separate injection (SSI) of working agent. During the first lowering-lifting operation (LLO), the underground equipment layout is equipped with a funnel, the well bottom is flushed with the help of flexible tubing string. When performing the second LLO, the wellhead is equipped with a standard flow meter, the geophysical cable is equipped with a fibre-optic cable and a geophysical cable disconnection device. Geophysical cable is connected with upper by bypass controlled electric valve with choke restriction assembly (BCEV-CRA) by means of the first branch, and also with lower BCEV-CRA by means of the second branch. Temperature is measured throughout the borehole. At the control station (CS) values of the flow rates from the bottom BCEV-CRA on the bottomhole flow rate of the working agent pumped to the lower stratum and from the upper BCEV-CRA on the bottomhole flow of the working agent pumped to the upper stratum are obtained. Total depth consumption of working agent pumped into upper and lower formations is determined. Method includes comparing in manual or automatic mode values of total depth and reference flow rates of working agent, if they differ, CS signals incorrect operation, depth calibration of equipment is performed.
EFFECT: technical result is reducing the time required for performing the LLO by equipping the installation with a geophysical cable disconnection device which enables to inject the working agent into the lower formation in case of failure of the upper BCEV-CRA.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUSLY-SEPARATE DOWNLOADING OF THE WORKING AGENT, INSTALLATION AND REGULATORY DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2681719C1 |
DOWNHOLE DEVICE FOR SIMULTANEOUS-SEPARATE PUMPING OF AGENT | 2016 |
|
RU2613398C2 |
INJECTION WELL | 2015 |
|
RU2574641C2 |
METHOD OF CONTROLLED INJECTION OF LIQUID THROUGH FORMATION (VERSIONS) | 2016 |
|
RU2634317C1 |
DEVICE FOR DUAL INJECTION OPERATION OF AGENT IN WELL FORMATIONS (VARIANTS) | 2016 |
|
RU2626485C2 |
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS | 2017 |
|
RU2636842C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
PROGRAM-CONTROLLED INJECTION WELL | 2015 |
|
RU2578078C2 |
BOREHOLE UNIT WITH FIELD EXPLOITATION MONITORING AND CONTROL SYSTEM | 2014 |
|
RU2569390C1 |
METHOD AND DEVICE FOR ADJUSTABLE INJECTION OF FLUID TO LAYERS WITH AUTOMATED MEASURING OF PROCESS PARAMETERS | 2015 |
|
RU2610484C9 |
Authors
Dates
2020-09-01—Published
2019-11-21—Filed