FIELD: construction.
SUBSTANCE: invention relates to drains for road construction, and more specifically to road drainage reinforced concrete elements and channels, chutes consisting of these elements. Gutter reinforced concrete chute for road construction of sewage system of atmospheric precipitation in zones of high and ultrahigh loads includes bottom and longitudinal side walls, reinforcement of concrete with metal elements. Metal reinforcing elements in the form of reinforcement bars are spatially arranged along the bottom and walls, are interconnected with each other, forming a spatial frame, and the catch are recessed into the concrete of the tray. Rods are uniformly distributed in longitudinal, transverse and vertical directions, respectively along bottom and along walls, longitudinally and in height, at least in two rows, crosswise and vertical branches in 10–30 rows. Reinforcement in vertical direction is made of solid curved rod and forms multiple parallel vertical branches.
EFFECT: technical result is high resistance to high systematic loads.
4 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
REINFORCED CONCRETE GUTTER SUPPORT ASSEMBLY UNIT AND TRAY | 2019 |
|
RU2731757C1 |
STORM DRAIN GUTTER | 2022 |
|
RU2787179C1 |
THE METHOD OF ERECTING A GUTTER TRAY FOR STORM SEWERS | 2022 |
|
RU2787180C1 |
WATER INTAKE GRATE FOR STORM SEWER TRAY | 2022 |
|
RU2787178C1 |
DRAINAGE CANAL ELEMENT | 2014 |
|
RU2573490C1 |
METHOD OF ORGANIZATION OF DRAINAGE | 2018 |
|
RU2667931C1 |
SLOT GRILL FOR DRAINAGE CHANNELS (VERSIONS) | 2011 |
|
RU2459048C1 |
TRAY FOR SYSTEMS OF WATER COLLECTION AND REMOVAL FROM THE ROADWAY | 2020 |
|
RU2738676C1 |
METHOD OF CONSTRUCTING A DRAINAGE STRUCTURE | 2019 |
|
RU2699086C1 |
BRIDGE CONSTRUCTION, ENCLOSING EMBANKMENT OF RAIL WAY BED OF THE BRIDGE CONSTRUCTION, JOINING THE BRIDGE CONSTRUCTION TO ACCESS EMBANKMENT AND REINFORCED SKELETON OF BRIDGE CONSTRUCTION BEAM | 1992 |
|
RU2043458C1 |
Authors
Dates
2020-09-08—Published
2019-12-25—Filed