METHOD FOR ERECTION OF CONTINUOUS STEEL-REINFORCED CONCRETE SUPERSTRUCTURE OF BRIDGE WITH MONOLITHIC REINFORCED CONCRETE SLAB Russian patent published in 2020 - IPC E01D21/06 

Abstract RU 2737771 C1

FIELD: bridge engineering.

SUBSTANCE: invention relates to bridge construction and can be used in construction of multi-span steel-concrete superstructures of bridges with monolithic reinforced concrete slab by longitudinal slip. Method of erection of continuous steel and concrete span structure includes the following operations: assembly on coast stand of assembly of span metal blocks with length equal to two first spans, with required construction lift, concreting of reinforced concrete slab at section of section I, primary reduction of reinforced concrete slab on section of section I by lowering on jacks, secondary reduction of reinforced concrete slab on section of section I by means of jacking of the end of the first span with fixation by a trunnion, longitudinal overrunning of steel-concrete span section by method of conveyer-rear assembly of span metal part by length of one span, concreting of reinforced concrete plate on section II section with length equal to span, reduction of reinforced concrete slab of section II by lowering method on jacks, longitudinal sliding of sections I and II of steel-concrete span structure by means of conveyer-rear assembly of span metal part by length of the next section.

EFFECT: objective of invention is reduction of material consumption and labor intensity of manufacturing and installation, increase of durability and operational reliability of bridges with steel-concrete span structures.

1 cl, 5 dwg

Similar patents RU2737771C1

Title Year Author Number
METHOD OF MOUNTING AN UNSPLIT STEEL-FERROCONCRETE BRIDGE SPAN STRUCTURE 0
  • Dankov Valerij Sergeevich
  • Datskovskij Vladimir Modestovich
SU1333736A1
STEEL/REINFORCED CONCRETE SPAN 1992
  • Utkin Vladimir Aleksandrovich
RU2040629C1
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION 2004
  • Kurakin P.P.
  • Korotin V.N.
  • Chalenko V.V.
  • Dudarev S.V.
  • Melkonjan A.S.
  • Birjukov E.N.
  • Potapov S.V.
RU2242559C1
STEEL/FERROCONCRETE UNSPLIT BRIDGE SPAN STRUCTURE AND METHOD OF MOUNTING SAME 0
  • Ilyushenko Valerij Timofeevich
  • Dankov Valerij Sergeevich
  • Puzikov Vladimir Ivanovich
  • Parshikov Sergej Dmitrievich
SU1350227A1
METHOD FOR ASSEMBLING OVER-PIER PART OF BRIDGE SPAN STRUCTURE 2003
  • Najval'T I.A.
  • Rogach V.I.
  • Zverev G.L.
  • Khaliullin Ju.M.
  • Polishko G.Ju.
  • Denisov M.I.
  • Bogdanov A.N.
  • Tsepenok V.I.
RU2247805C2
STEEL AND REINFORCED CONCRETE SPAN STRUCTURE OF BRIDGE 0
  • Dankov Valerij Sergeevich
  • Gomarov Valerij Grigorevich
  • Kruchinkin Aleksej Vasilevich
  • Streletskij Nikolaj Nikolaevich
SU926146A1
METHOD OF MOUNTING A SOLID BRIDGE SPAN STEEL-FERROCONCRETE STRUCTURE 0
  • Nazarova Roza Pavlovna
  • Rudomazin Nikolaj Nikolaevich
SU887696A1
COMPOSITE BRIDGE SPAN STRUCTURE AND METHOD OF ITS PRODUCTION 2003
  • Reshetnikov V.G.
  • Kruchinkin A.V.
  • Egorov V.P.
  • Reshetnikov I.V.
  • Kruchinkin A.A.
RU2246573C1
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST 2012
  • Bikbau Marsel' Janovich
  • Bikbau Ul'Jana Marsel'Evna
RU2513574C2
JOINT STRUCTURES FOR CONTINUOUS BRIDGE SPAN ASSEMBLIES IN OVER-PIER AREAS 2005
  • Sumin Mikhail Aleksandrovich
  • Sumin Aleksandr Mikhajlovich
RU2296193C1

RU 2 737 771 C1

Authors

Utkin Vladimir Aleksandrovich

Dates

2020-12-02Published

2020-06-29Filed