FIELD: hydrocarbon (oil, gas, gas condensate, gas-hydrate or mixture) production and formation pressure maintaining means in multiplay fields and, particularly, for simultaneous separate, as well for periodical or successive operation of several production facilities (production formations or interlayers) by single (blower, gas-lift, beam, injection and so on) boreholes.
SUBSTANCE: plant comprises one or several pipe strings lowered and installed in borehole. At least one pipe string is provided with at least two devices, namely with packer and disconnector. The plant may be separated from packer and removed from the borehole after lowering and leak-proof fitting of at least one packer in pipe string. Then pipe string having lesser, equal or greater diameter and provided with one or several devices, namely packer, disconnector, may be lowered and installed in the borehole. The disconnector comprises two removable and fixed parts, one or several borehole chambers with releasable valves, telescopic connection and pump. Pipe string is lowered directly in the borehole or in pipe string having greater diameter or is connected in leak-proof manner but loosely with corresponding fixed packer through disconnector. Pipe string bottom below packer installed above or under lower formation is hydraulically isolated or connected with borehole bottom.
EFFECT: increased technological efficiency and plant reliability.
23 cl, 38 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONCURRENT-SEPARATE OPERATION OF SEVERAL BEDS VIA ONE FORCE WELL IN TURNS | 2003 |
|
RU2253009C1 |
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) | 2004 |
|
RU2305170C2 |
DEVICE FOR CUTTING OFF AND CONTROLLING FLOW IN A WELL WITH ONE OR SEVERAL FORMATIONS | 2005 |
|
RU2291949C2 |
METHOD FOR SIMULTANEOUS SEPARATE MULTIPLE-ZONE WELL OPERATION | 2006 |
|
RU2313659C1 |
SHARIFOV'S PACKER SYSTEM (VERSIONS) | 2007 |
|
RU2365740C2 |
METHOD OF DUAL OIL PRODUCTION FROM LAYERS OF ONE WELL WITH SUBMERSIBLE PUMP SET (VERSIONS) | 2007 |
|
RU2344274C1 |
DOWNHOLE PLANT FOR REGULATION AND SHUTOFF OF MEDIUM FLOW | 2001 |
|
RU2194152C2 |
METHOD OF INVESTIGATION OF LEAKTIGHTNESS OR LEAKINESS OF PACKER SYSTEM AND CEMENT BRIDGE OF WELL | 2011 |
|
RU2475641C1 |
EQUIPMENT FOR MULTI-RESERVOIR WELL SUMULTANIOUS-SEPARATE RECEARCH AND PRODUCTION WITH ELECTIRCAL SUBMERSIBLE PUMP (VERSIONS) | 2008 |
|
RU2380522C1 |
EQUIPMENT FOR MULTIPLE PRODUCTION OF MULTILAYER FIELD WELLS | 2008 |
|
RU2376460C1 |
Authors
Dates
2005-10-20—Published
2003-06-05—Filed