FIELD: construction.
SUBSTANCE: polygonal arch includes elements made of steel profiles, connected to each other at their ends by a central bolt and finally fixed by mounting bolts located on a circle around the central bolt. The polygonal arch is made of a set of the elements of two types that are sequentially connected to each other. The first type is made of a rolled I-beam, and the second type is made of two cold-bent channel bars. The cross-section height hch.b. is equal to the height of the I-beam wall hwall. The axis of the central bolt is located at the ends of the elements in the middle of their cross-section, around which their wall is cut off along the semicircle from the radius R=hwall/2 of both the I-beam and the channel bars, and at the end of the semicircle of the I-beam, shelves are cut off. The shelves of the channel bars are bent and welded to the semicircle of the wall.
EFFECT: eliminating the gussets that connect the elements of the same type, and reducing in the node of their connection to a single central bolt, around which the mounting bolts are located on a circle.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ERECTION OF ARCHED BUILDING | 2009 |
|
RU2423581C1 |
CENTRAL ASSEMBLY OF THE UPPER BELT OF THE FIBERGLASS DUO-PITCH TRUSS | 2020 |
|
RU2731553C1 |
SINGLE-LAYER NET VAULT WITH DOUBLE CURVATURE | 2014 |
|
RU2558554C1 |
COMPOSITE MANSARD ROOF | 2006 |
|
RU2317380C1 |
METHOD TO MANUFACTURE POLYGONAL ARC FROM BOX-SHAPED PROFILES | 2012 |
|
RU2515638C1 |
METHOD TO MANUFACTURE LIGHT ARCHED GIRDER | 2011 |
|
RU2484214C1 |
ROOF TRUSS SUPPORT ASSEMBLY | 2018 |
|
RU2732768C2 |
ARCHED BUILDING | 2021 |
|
RU2767814C1 |
POLYGONAL FRAME-ARC STRUCTURE | 2012 |
|
RU2515142C1 |
FRAME OF CHANNELS | 2014 |
|
RU2623378C2 |
Authors
Dates
2021-07-02—Published
2020-10-28—Filed