FIELD: oil and gas industry.
SUBSTANCE: claimed method of preparation of oil and gas wells with horizontal completion for operation. The method includes directional drilling of wells with horizontal ends. Running a production string in a horizontal well completion. Anchoring the production casing using casing packers or cementing to form a cement stone. Conducting the first stage of hydraulic fracturing (HF) using a high-pressure HF pump, conducting field geophysical studies of the horizontal well completion in the production string by tripping operations of geophysical equipment. Running a multistage hydraulic fracturing assembly with a packer plug and cumulative perforating systems, performing subsequent HF stages. The first stage of hydraulic fracturing (HF) is carried out immediately after fixing the production string in the horizontal end of the well using a hydraulic coupling installed at the end of the production string and a high-pressure HF pump. The template is hydrotransported to the end of the well and the template is lifted, then the assembly with geophysical instruments is lowered by hydrotransportation until the end of the well using a HF pump. On the rise, field geophysical surveys are carried out, after which the subsequent stages of HF are carried out.
EFFECT: simplification and acceleration of operations for preparing oil and gas wells for operation, increase in productivity of the equipment used and reducing the time required.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INTERVAL MULTISTAGE HYDRAULIC FRACTURING OF FORMATION IN OIL AND GAS WELLS | 2016 |
|
RU2634134C1 |
METHOD OF WELL PREPARATION FOR HYDRAULIC FRACTURING OF RESERVOIR IN OIL AND GAS WELLS | 2020 |
|
RU2747033C1 |
METHOD FOR MULTI-STAGE HYDRAULIC FRACTURING IN WELL WITH HORIZONTAL TERMINATION | 2019 |
|
RU2732891C1 |
METHOD FOR REPEATED MULTISTAGE HYDRAULIC FRACTURING IN A WELL WITH A HORIZONTAL TAILING-IN USING A CASING STRING OF A SMALLER DIAMETER | 2021 |
|
RU2775112C1 |
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING | 2021 |
|
RU2775628C1 |
FORMATION IN THE WELL INTERVAL BY INTERVAL MULTI-STAGE HYDRAULIC FRACTURING PERFORMANCE METHOD AND A DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2682391C1 |
METHOD FOR REPEATED MULTISTAGE HYDRAULIC FRACTURING WITH DIVERTING PACKS IN HORIZONTAL WELL | 2022 |
|
RU2808396C1 |
METHOD FOR COMPLETION OF CONSTRUCTION OF PRODUCTION WELL WITH HORIZONTAL END OF WELLBORE | 2019 |
|
RU2726096C1 |
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING | 2016 |
|
RU2622961C1 |
METHOD OF OIL FIELD DEVELOPMENT | 2008 |
|
RU2375562C2 |
Authors
Dates
2021-11-09—Published
2021-04-11—Filed