FIELD: mining industry.
SUBSTANCE: invention relates to the mining industry and can be used in the construction of capital and sewage workings, having a mutual intersection. The method of strengthening fractured rocks during the construction of junctions of horizontal mine workings includes drilling wells for conductors and installing conductors, mounting valves on conductors, drilling cementing wells, preparing and pumping cement mortars, dismantling valves. Cement wells are drilled in the roof and sides of the main working at a given pitch, then packers are installed. The grout is injected within the grout curtain contour. The inner contour of the grout curtain is the contour of the projected interface of mine workings, and the outer one is the boundary of the natural collapse vault.
EFFECT: improving the safety of work during the construction of mine workings in fractured rocks, as well as facilitating the development of rocks within the interface contour.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DRIVING DRAINING MINES IN BROKEN AND WATERED MASSIF | 2002 |
|
RU2249699C2 |
TAMPING METHOD OF MARGINAL ROCKS MASSIF OF MINES BRIDGES | 2018 |
|
RU2677722C1 |
METHOD FOR EVALUATION OF QUALITY OF CEMENTATION OF ROCK MASS | 1992 |
|
RU2039256C1 |
METHOD OF CEMENT INJECTION OF FRACTURED GROUND | 2007 |
|
RU2337241C1 |
MINE SUPPORT METHOD AND DEVICE | 2006 |
|
RU2320875C1 |
METHOD FOR STRENGTHENING OF CRACKED ROCKS | 2008 |
|
RU2387838C1 |
“BRIDGE-CEMENT CURTAIN” CONSOLIDATING ISOLATION SYSTEM CONSTRUCTION METHOD | 2018 |
|
RU2679212C1 |
METHOD FOR STRENGTHENING OF ROCK MATTER | 1996 |
|
RU2112881C1 |
METHOD FOR STRENGTHENING OF SOFT FRACTURED MODULAR SOLID ORES | 2011 |
|
RU2484250C1 |
METHOD FOR REINFORCEMENT OF MINES SOIL | 2011 |
|
RU2468207C1 |
Authors
Dates
2021-11-25—Published
2021-05-25—Filed