FIELD: mining industry.
SUBSTANCE: method includes erection of wall, prior reinforcement of rock massif along extraction track by drilling longitudinal and slanting wells and forcing reinforcing cementing solutions into these wells, destruction and cleaning of rocks under protection of cementing cover, erection of permanent support, following reinforcement of contour-adjacent massif by cementation solutions through wells, drilled perpendicularly to mine axis. Draining wells are additionally drilled with delay through cementing layer having length greater than thickness of reinforced rocks zone, to form a draining layer around reinforced cover.
EFFECT: higher effectiveness.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STRENGTHENING OF ROCK MATTER | 1996 |
|
RU2112881C1 |
METHOD OF ERECTING A ROOF SUPPORT IN MINE WORKING | 0 |
|
SU985304A1 |
METHOD OF DRIVING OF MINE WORKINGS UNDER COMPLICATED GEOLOGICAL CONDITIONS | 1999 |
|
RU2171894C2 |
METHOD OF INCLINED MINE WELLHEAD CONSTRUCTION IN DEPOSITIONS | 2008 |
|
RU2376419C1 |
METHOD TO CREATE ROCK SUPPORT OF MINE | 2012 |
|
RU2498073C1 |
METHOD FOR STRENGTHENING FACKED ROCKS DURING CONSTRUCTION OF CONNECTIONS OF HORIZONTAL MINING WORKS | 2021 |
|
RU2760451C1 |
METHOD FOR FASTENING WORKING | 1994 |
|
RU2065055C1 |
TAMPING METHOD OF MARGINAL ROCKS MASSIF OF MINES BRIDGES | 2018 |
|
RU2677722C1 |
METHOD FOR SUPPORTING SOIL OF MINE WORKINGS | 2011 |
|
RU2459907C1 |
METHOD FOR REINFORCEMENT OF MINES SOIL | 2011 |
|
RU2468207C1 |
Authors
Dates
2005-04-10—Published
2002-10-10—Filed