FIELD: oil and gas industry.
SUBSTANCE: invention relates to the oil and gas industry, in particular to methods for the initial opening of the reservoir by wells with an extended (1000 m or more) horizontal or inclined section passing in the zones of complications. A method for constructing a well with an extended horizontal or inclined section in unstable rocks includes construction in unstable rocks, in which zones of complications are preliminarily determined, wells with a wellhead vertical section and a horizontal or inclined section with the end entering the productive formation. The zones of complications of unstable rocks are covered with a string of pipes, followed by deepening of the well with a bit of a smaller diameter and final fixing by cementing with a production casing string. A well changes from a vertical to a horizontal or deviated section when the well is drilled. The zones of complications are sequentially opened using drilling fluids with a density of 1.30-1.40 g/cm3, followed by successive fastening from the mouth with a pipe string in the form of casing pipes of successively decreasing diameter, with cementing the annulus. The entire horizontal and/or inclined section in the zones of complications is covered with an intermediate casing string, equipped every 10-50 m with rigid longitudinal centralizers, the circumscribed circle diameter of which is 3-20 mm less than the diameter of the drilled hole.
EFFECT: expanding functionality of well construction due to drilling in extended zones of complications with a horizontal or inclined section.
1 cl, 2 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF DRILLING WELL WITH COMPOSITE STRING | 2023 | 
 | RU2823324C1 | 
| METHOD FOR DRILLING OF LATERAL TRUNK WITH UNSTABLE ROCKS | 2022 | 
 | RU2785164C1 | 
| METHOD FOR DRILLING A SIDETRACK OF A WELL WITH UNSTABLE ROCKS | 2023 | 
 | RU2798542C1 | 
| METHOD OF CONSTRUCTING A SIDE WELL SHAFT | 2020 | 
 | RU2728178C1 | 
| METHOD FOR DRILLING A WELL WITH AN EXPOSED RESERVOIR | 2022 | 
 | RU2787163C1 | 
| UNSTABLE ROCKS DRIVING METHOD DURING DRILLING OF OFFSHOOT WITH HORIZONTAL END | 2019 | 
 | RU2714397C1 | 
| METHOD FOR INITIAL EXPOSING OF COMPLEX CAVERNOUS-FRACTURE OF CARBONATE OIL AND GAS SATURATED FORMATION WITH HORIZONTAL SHAFT OF LONG LENGTH | 2015 | 
 | RU2598268C1 | 
| CONSTRUCTION METHOD OF WELL SHAFT THROUGH UNSTABLE CLAY MINE ROCKS | 2012 | 
 | RU2474669C1 | 
| METHOD OF MULTILAY FIELD DEVELOPMENT | 2012 | 
 | RU2505667C1 | 
| METHOD FOR CONSTRUCTION OF MULTI-HOLE WELL IN UNSTABLE RESERVOIRS | 2024 | 
 | RU2825795C1 | 
Authors
Dates
2022-09-14—Published
2022-02-21—Filed