FIELD: gas industry.
SUBSTANCE: invention relates to methods for producing gas from drilling boreholes. To implement the method for adjusting the operating modes of multiple gas and gas condensate boreholes, first, target values of equivalent diameters of the flow sections of the wellhead regulators are predetermined using a hardware-software hydrodynamic model of the cluster for each borehole in the cluster and the regulator at the entrance to the central gas treatment plant at the gas pressures, flow rates, and temperatures corresponding to the maximum production of hydrocarbons from the boreholes. The actual equivalent diameters of the flow sections of the wellhead regulators are determined for each borehole in the cluster at the actual layer and wellhead gas pressures, flow rates, and temperatures at the boreholes in the cluster and at the actual pressure before the regulator at the entrance to the central gas treatment plant. The target value of gas pressure before the regulator at the entrance to the central gas treatment plant is determined at the target value of equivalent diameter of the regulator at the entrance to the central gas treatment plant. The target flow rates and wellhead pressures are calculated for the first borehole in the cluster using the hardware and software model of the cluster, wherein the equivalent diameter of the wellhead regulator is substituted with the target value thereof. The calculation is repeated stepwise for the remaining boreholes in the cluster, substituting the equivalent diameter of the wellhead regulator of the borehole with the target value thereof at each step. The diameters of the remaining wellhead regulators are set according to the values thereof established at the previous step of calculation. The resulting pressure values are used when setting the target pressure value before the regulator at the entrance to the central gas treatment plant and then at the wellhead regulators of each borehole in the cluster.
EFFECT: control of the operation of multiple boreholes in a single cycle with an increase in the gas production.
2 cl, 2 dwg, 6 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPTIMISING PROCESS MODE OF OPERATION OF GAS AND GAS CONDENSATE WELLS | 2015 |
|
RU2607326C1 |
METHOD FOR GAS CONDENSATE INVESTIGATION OF WELLS | 2022 |
|
RU2784672C1 |
METHOD OF PARAMETERS DETERMINATION OF MAXIMUM PROCESS MODE OF GAS FIELD | 2014 |
|
RU2571787C2 |
METHOD OF OPTIMIZATION OF THE PERIODICITY OF GASDYNAMIC WELL RESEARCH ON OIL AND GAS CONDENSATE FIELDS OF THE EXTREME NORTH | 2017 |
|
RU2661502C1 |
METHOD FOR NATURAL GAS PRODUCTION AT LATE STAGE OF FIELD DEVELOPMENT | 2020 |
|
RU2758278C1 |
METHOD FOR REGULATING PRESSURE AT INLET TO FIELD DURING DEVELOPMENT OF MULTI-LAYER GAS FIELDS | 2020 |
|
RU2767810C1 |
METHOD FOR INTELLECTUALIZATION OF GAS AND GAS-CONDENSATE FIELDS | 2020 |
|
RU2743685C1 |
METHOD FOR DETERMINATION OF HYDRODYNAMIC CONNECTION BETWEEN SECTIONS OF PRODUCTIVE FORMATION AND FILTRATION-VOLUMETRIC PROPERTIES OF INTERWELL SPACE OF CENOMANIAN DEPOSIT AT FIELD START-UP AFTER SHUTDOWNS BASED ON RESULTS OF INTEGRAL HYDRAULIC INTERFERENCE TESTING AT WELLS | 2023 |
|
RU2819121C1 |
METHOD OF OPERATING GAS FIELD IN COLLECTOR-BEAM ARRANGEMENT SCHEME COLLECTION AT FINAL STAGE OF DEPOSIT DEVELOPMENT | 2015 |
|
RU2597390C1 |
METHOD FOR CONTROL OF GAS PRODUCTION IN A MULTILAYER FIELD AND A SYSTEM FOR ITS IMPLEMENTATION | 2022 |
|
RU2798646C1 |
Authors
Dates
2023-01-31—Published
2021-12-27—Filed