FIELD: oil and gas production.
SUBSTANCE: invention is related to hydraulic fracturing operations. To implement the hydraulic fracturing method and bring the well to production, the properties of the formation, hydraulic fracturing materials, and the wellbore are determined for the stimulation operation. One or more preliminary designs of reservoir treatment by hydraulic fracturing and well flow rate are selected. The data obtained at the previous stages is entered into one or more computer models to calculate the productivity of the well after the formation has been treated by hydraulic fracturing. A treatment project and a well commissioning project are selected. The formation is treated by hydraulic fracturing in accordance with the selected project. Commissioning is initiated and production is carried out in the well. Computer models contain models of hydraulic fracturing, fracture conductivity and well flow rate. The fracture conductivity model is calculated taking into account the compaction factor.
EFFECT: increase in the well production rate, taking into account the decrease in fracture conductivity during the production period.
11 cl, 12 dwg, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDRAULIC FRACTURING (OPTIONS) | 2023 |
|
RU2811048C1 |
METHOD FOR PREDICTING HYDRAULIC FRACTURING OF FORMATION, METHOD OF HYDRAULIC FRACTURING OF FORMATION, METHODS FOR PREDICTING RISKS OF FORMATION HYDRAULIC FRACTURING | 2017 |
|
RU2730576C1 |
METHOD FOR OPTIMISING PRODUCTION OF THE RESERVOIR FLUID FROM A BOREHOLE AFTER ACIDIC HYDRAULIC FRACTURING | 2020 |
|
RU2759621C2 |
METHOD OF DEVELOPING LOW-PERMEABILITY OIL FIELDS BASED ON THE USE OF HORIZONTAL WELLS WITH LONGITUDINAL FRACTURES OF HYDRAULIC FRACTURING | 2017 |
|
RU2660683C1 |
DETERMINATION OF PARAMETERS OF BOTTOMHOLE FRACTURE PART OF FRACTURE WITH USE OF ELECTROMAGNETIC WELDING OF BOTTOMHOLE FRACTURE PART OF FRACTURE FILLED WITH CONDUCTIVE PROPPANT | 2015 |
|
RU2668602C1 |
METHOD OF DEVELOPING A LOW-PERMEABILITY RESERVOIR WITH ALTERNATE INITIATION OF AUTO-HYDRAULIC FRACTURES | 2020 |
|
RU2745058C1 |
LOW-PERMEABILITY FORMATION DEVELOPMENT METHOD | 2020 |
|
RU2741883C1 |
METHOD OF ANALYSING HORIZONTAL WELLS WITH MULTISTAGE HYDRAULIC FRACTURING IN LOW-PERMEABILITY HEADERS | 2019 |
|
RU2734202C1 |
METHOD AND SYSTEM FOR MODELING HYDRAULIC FRACTURES OF A FORMATION OF FINITE/INFINITE CONDUCTIVITY AND LATERAL-LONGTITUDINAL LOCATION RELATIVE TO A HORIZONTAL WELLBORE | 2020 |
|
RU2745142C1 |
METHOD FOR ANALYSIS AND DESIGN OF STIMULATION OF AN UNDERGROUND FORMATION | 2017 |
|
RU2739287C1 |
Authors
Dates
2023-06-16—Published
2022-07-25—Filed