AUTOMATED METHOD FOR PERFORMING GAS LIFT OPERATIONS Russian patent published in 2024 - IPC E21B43/12 E21B21/08 E21B34/02 E21B41/00 E21B47/08 E21B47/06 

Abstract RU 2811011 C1

FIELD: gas lift operations.

SUBSTANCE: group of inventions is related to a method for controlling a compressor system during gas lift operations. The compressor system is operated at an initial gas flow rate during injection sufficient to lift all liquids from the well. The compressor system is operated during the first incremental period of time at the first incremental gas flow rate during injection. The first incremental gas flow rate during injection is either greater than the initial gas flow rate during injection, or less than the initial gas flow rate during injection. The production of fluids from the well is continued during the first incremental period and at the same time the pressure in the well is monitored during production. The average production pressure over an incremental period is determined. Moreover, when the first incremental gas flow rate during injection is greater than the initial gas flow rate during injection, the compressor system is operated during the second incremental period of time at the second incremental gas flow rate during injection, where the second incremental gas flow rate during injection is greater than the first incremental gas flow rate during injection. Or, when the second incremental injection gas flow rate is less than the first incremental injection gas flow rate, the compressor system is operated for a second incremental period of time at the second incremental injection gas flow rate during injection, where the second incremental injection gas flow rate during injection is less than the first incremental flow rate gas during injection. The production of fluids from the well is continued during the second incremental period and at the same time the pressure in the well is monitored during production. The average pressure during production is determined during the second incremental period. When the first incremental injection gas flow rate is greater than the initial injection gas flow rate during injection, the compressor system is operated for a third incremental time period at the third incremental injection gas flow rat during injection. The third incremental gas flow rate during injection is greater than the second incremental gas flow rate during injection. Or, when the first incremental injection gas flow rate is less than the initial injection gas flow rate, the compressor system is operated for a third incremental time period at the third incremental injection gas flow rate. The third incremental gas flow rate during injection is less than the second incremental gas flow rate during injection. The production of fluids from the well is continued during the third incremental period and at the same time the pressure in the well is monitored during production. The average pressure during production is determined during the third incremental period. The incremental gas injection rate at which the lowest production pressure is generated while all fluids are being discharged from the well is identified. The identified incremental gas flow rate during injection is set as the working gas flow rate during injection for the compressor system, and the compressor system operates to produce all fluids from the well.

EFFECT: increase of efficiency of regulating the operation of the compressor system, increasing the efficiency of liquid production from the well.

22 cl, 13 dwg

Similar patents RU2811011C1

Title Year Author Number
MAXIMUM EFFECTIVE OIL WITHDRAVAL FROM PRODUCTION WELL NORM METHOD 2008
  • Kuznetsov Oleg Leonidovich
  • Guz' Viktor Gennadievich
  • Iljukhin Sergej Nikolaevich
RU2379479C1
METHOD OF DEVELOPMENT OF GAS-AND-OIL RESERVOIRS 2013
  • Timchuk Aleksandr Stanislavovich
  • Ivantsov Nikolaj Nikolaevich
RU2547530C1
METHOD (VERSIONS), SYSTEM (VERSIONS) AND MACHINE-READABLE MEDIUM (VERSIONS) FOR EXECUTION OF OPERATIONS OF SUPPORTING GAS DISTRIBUTION IN OIL FIELD 2007
  • Rashid Kashif
  • Shehnd Ehndrju Majkl
  • Tonkin Trevor
  • Letitsija Ljuka
  • Khauehll Ehndrju Dzhon
  • Lukas-Klements Dehniehl
RU2491416C2
METHOD FOR DEVELOPMENT OF TECTONICALLY SCREENED OIL-GAS DEPOSIT 1996
  • Semenjakin V.S.
  • Suslov V.A.
  • Shchugorev V.D.
RU2103487C1
FLOW REGULATION OF MULTIPHASE FLUID MEDIUM, SUPPLIED FROM WELL 2005
  • Ehken Adrian Nikolas
RU2386016C2
OIL EXTRACTION METHOD 2023
  • Penigin Artem Vitalevich
RU2814219C1
SYSTEM, METHOD AND INSTALLATION FOR MEASUREMENT OF MULTI-PHASE FLOW 2010
  • Penge Brjuno
  • Bornia Onerazan
  • Ru Zhill'
RU2535638C2
METHOD FOR MINE DEVELOPMENT OF OIL POOL 1992
  • Aliev A.G.O.
  • Konoplev Ju.P.
  • Tjun'Kin B.A.
  • Chikishev G.F.
RU2044873C1
METHOD (VERSIONS) OF ANALYSIS OF COLLECTOR PROPERTIES OF UNDERGROUND RESERVOIRS WITH EXISTENT FISSURES 2006
  • Krehjg Dehvid P.
RU2417315C2
SENSOR SYSTEM 2005
  • Shuzenu Kristian
  • Zhjund Zhak
  • Salamitu Filipp
RU2374440C2

RU 2 811 011 C1

Authors

Talton, Bruks, Mimz Iii

Bejker, Aaron

Perri, Erik

Myunding, Pol

Khadson, Dzhon D.

Dates

2024-01-10Published

2020-08-19Filed