FIELD: tertiary oil recovery, particular, mine recovery of oil with use of heat in development of oil pools with high-viscosity oils and movable bitumens. SUBSTANCE: series of underground mine workings are driven. Drilled from working gallery are injection and producing holes. Initial production rate of producing holes are determined. Holes with maximum production rate are closed, and heat carrier is injected into injection holes. Upon attainment of production rate equalling maximum value of each separate holes and by all producing holes, all holes are operated with maximum possible time of operation up to attaining the design recovery of oil of the district. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL POOL | 1993 |
|
RU2053353C1 |
METHOD FOR EXPLORATION OF MULTI-SEAM OIL DEPOSIT WITH RESERVOIRS OF DIFFERENT STRUCTURE TYPE | 1993 |
|
RU2072031C1 |
METHOD FOR EXPLOITATION LAYERED OIL STRATA INHOMOGENEOUS IN PERMEABILITY | 1991 |
|
RU2068947C1 |
METHOD FOR EXPLOITATION OF HIGH-VISCOSITY OIL POOL | 1991 |
|
RU2062865C1 |
METHOD FOR DEVELOPMENT OF HETEROGENEOUS MULTILAYER OIL FIELD | 1991 |
|
RU2024740C1 |
METHOD OF MINING OIL POOL | 1978 |
|
SU930976A1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS NONUNIFORM ABOUT RESERVOIR PROPERTIES IN DIFFERENT ZONES | 1993 |
|
RU2046181C1 |
METHOD OF DEVELOPMENT OF OIL POOL HAVING RESERVOIR PITCHING-OUT ZONES | 1994 |
|
RU2090743C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL BY IN-BED BURNING | 1995 |
|
RU2087690C1 |
METHOD FOR DEVELOPMENT OF OIL-GAS CONDENSATE FIELD | 1987 |
|
SU1527990A1 |
Authors
Dates
1995-09-27—Published
1992-09-23—Filed