FIELD: mining.
SUBSTANCE: invention relates to oil production and represents a new method of pressure injection in tubing strings. Method of mechanized oil production includes use of pump and compressor equipment. Tubing sections are used for erection of tubing string, each of which is equipped with electrically driven pump of helical-axial type, which is integrated into each section as well as heating element. Electrically driven pump of helical-axial type and heating element are supplied via control automatics from power cable. Injection of head pressure in the tubing string is performed uniformly along the whole length of the string as well as stabilization of physical and mechanical properties of pumped liquid. Each tubing section is stage of multi-stage pump, where maximum head is proportional to number of tubing sections. Each tubing section is equipped with a piece of a power cable ended with tight plugs with an angular degree of freedom, which join the power cable at unscrewing of the sections.
EFFECT: improving energy efficiency, unifying the process of mechanized oil production, simplifying the operation processes of operating wells, increasing operating life of tubing equipment, reducing the amount of ground equipment.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PUMPING-EJECTOR PLANT FOR DOWNHOLE FLUID TRANSFER FROM LOWER TO UPPER FORMATION | 2019 |
|
RU2718553C1 |
HEATING METHOD OF WELL BOTTOM HOLE AREA AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2559975C1 |
ELECTRIC SUBMERSIBLE GEAR PUMP INSTALLATION | 2018 |
|
RU2746292C2 |
CABLE SYSTEM FOR OIL PRODUCTION INSTALLATION | 2022 |
|
RU2781972C1 |
INSTALLATION OF ELECTRIC SUBMERSIBLE HYDRAULIC PISTON PUMP | 2015 |
|
RU2605789C2 |
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2014 |
|
RU2546218C1 |
METHOD FOR SURVEY OF WELL EQUIPPED WITH SUBMERSIBLE MOTOR | 0 |
|
SU1745911A1 |
METHOD FOR DESTROYING AND PREVENTING DEPOSITS AND PLUGS FORMATION IN OIL AND GAS WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2503797C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2562641C2 |
DEVICE FOR DUAL COMPLETION | 2023 |
|
RU2804087C1 |
Authors
Dates
2025-05-16—Published
2021-10-18—Filed