FIELD: mining.
SUBSTANCE: invention relates to the oil and gas industry, specifically to methods for treating the bottom-hole zone of a wellbore before oil or gas production in order to remove the polymer-carbonate filter cake formed when filtering a drilling biopolymer mud when drilling an open-hole well, and can be used in fields where drilling and opening of productive formations is carried out on clay-free weighted drilling fluids. Method of cleaning a wellbore from a filtration cake of a drilling mud comprises injecting and holding in wellbore for 24–72 hours a composition containing, wt.%: ammonium fluoride peroxo-solvate 0.5–10, triethanolamine 0.01–5.0, water is the rest. Said composition contains a peroxo-solvate of ammonium fluoride with concentration of hydrogen peroxide in an amount of more than 45 wt.%.
EFFECT: increased range of formation temperatures from 15 °C to 120 °C, at which the effective removal of the filtration cake of the drilling mud and increase in the recovery factor of the permeability of the bottomhole zone of the well are provided.
8 cl, 2 tbl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
COMPOSITION FOR TREATMENT OF BOTTOMHOLE ZONE OF OIL AND GAS FORMATION | 2021 |
|
RU2759042C1 |
COMPOSITION FOR TREATMENT OF BOTTOM-HOLE ZONE OF FORMATION OF TERRIGENOUS RESERVOIR AND METHOD OF TREATMENT OF BOTTOM-HOLE ZONE OF FORMATION OF TERRIGENOUS RESERVOIR | 2024 |
|
RU2829685C1 |
COMPOSITION FOR TREATMENT OF BOTTOM-HOLE ZONE OF FORMATION OF CARBONATE RESERVOIR AND METHOD OF TREATMENT OF BOTTOM-HOLE ZONE OF FORMATION OF CARBONATE RESERVOIR | 2024 |
|
RU2832873C1 |
CHEMICAL REAGENT FOR THE TREATMENT OF THE BOTTOM-HOLE ZONE OF THE OIL WELL FORMATION | 2021 |
|
RU2776820C1 |
HYDRAULIC FRACTURING METHOD | 2024 |
|
RU2829680C1 |
COMPOSITION FOR TREATING BOTTOM ZONE OF OIL-GAS FORMATION | 2003 |
|
RU2242603C1 |
COMPOSITION FOR PROCESSING THE BOTTOM-HOLE ZONE OF CARBONATE AND TERRIGENOUS RESERVOIRS | 2021 |
|
RU2777039C1 |
METHOD OF PROCESSING PRIMARILY FLAT HORIZONTAL WELL HOLE FOR REMOVAL OF MUD BULK FROM BOTTOM-HOLE FORMATION ZONE | 2011 |
|
RU2467163C1 |
METHOD FOR COLMATAGE REMOVAL FROM BOTTOMHOLE FORMATION ZONE UPON FIRST OPENING TO RESTORE PERMEABILITY AND POROSITY OF HEADER | 2013 |
|
RU2540767C1 |
COMPOSITION FOR TREATMENT OF BOTTOM-HOLE ZONE OF CARBONATE RESERVOIR | 2019 |
|
RU2731302C1 |
Authors
Dates
2025-05-27—Published
2024-03-27—Filed