FIELD: mining.
SUBSTANCE: invention relates to production of natural gas and gas condensate. Essence of the invention consists in the fact that determination of the project trajectory of sidetrack well drilling is performed with account of geological and technological parameters of the formation in the construction zone, namely formation pressure, porosity, permeability, effective gas-saturated thickness. At that, ranging of all technically implemented versions of trajectories of the sidetrack well of the well is performed, taking into account the forecast profile of production and expansion of the operating zone of the deposit. Obtained trajectory of sidetrack well is used when making geological and technological construction plan and then during construction of sidetrack well.
EFFECT: reducing the number of complications when influx is caused and during operation of the well, increasing final coefficient of gas and gas condensate extraction from the formation.
1 cl, 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOCATING OFFSHOOTS FOR EXISTING WELL STOCK OR CONSTRUCTION OF NEW PRODUCTION WELLS TAKING INTO ACCOUNT ENERGY STATE OF MASSIVE BOTTOM WATER-DRIVE GAS RESERVOIRS | 2023 |
|
RU2824579C1 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSITS WITH LOW VERTICAL PERMEABILITY | 2008 |
|
RU2354809C1 |
METHOD OF DEVELOPING OIL OR OIL-GAS CONDENSATE MINEFIELDS AT LATE STAGE | 2008 |
|
RU2346148C1 |
MULTI ZONE OIL RESERVOIR AT LATE STAGE WITH UNSTABLE COVER FORMATION AND NON-HOMOGENEOUS COLLECTOR DEVELOPMENT METHOD | 2008 |
|
RU2382183C1 |
METHOD FOR HORIZONTAL WELL BORE DRILLING ON THE BASE OF GEOLOGICAL INVESTIGATIONS | 2006 |
|
RU2313668C1 |
METHOD FOR OIL DEPOSIT DEVELOPMENT WITH HORIZONTAL WELLS WITH MULTI-STAGE FRACING | 2018 |
|
RU2672292C1 |
METHOD FOR WELL DRILLING CONTROL WITH AUTOMATED SYSTEM FOR REAL-TIME CONTROL OF WELLS DRILLING | 2018 |
|
RU2701271C1 |
METHOD FOR ADVANCE DRILLING OF PILOT SHAFTS DURING CONSTRUCTION OF WELLS ON SHELF | 2023 |
|
RU2818392C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2556094C1 |
METHOD FOR DEVELOPMENT OF SECTION OF OIL RESERVOIR WITH HETEROGENEOUS RESERVOIR (VERSIONS) | 2024 |
|
RU2833660C1 |
Authors
Dates
2025-05-30—Published
2024-11-11—Filed