FIELD: underground coal mining. SUBSTANCE: roofing of powered support unit has capping 1 and canopy 2, removable bar 9 and hydraulic cartridge 12. Bar 9 has curved projections 5 interacting with curved recesses 3 on guides 8 of capping 1. Hydraulic cartridge 12 is installed on roofing for interaction with end of bar 9. Bar 9 has two supporting surfaces, one of them (surface a) carries canopy 2, and the other (surface b) carries hydraulic cartridge 12. Bar 9 is connected to ears 11 by means of pins 10. External load on canopy 2 is taken up by contacting surfaces 6 and 7 of bar 9 and hydraulic cartridge 12. When canopy 2 turns round center 0 of hinge joint, contacting surfaces 6 and 7 slide over curved sliding surfaces 4 of curved recesses 3. Canopy 2 is mounted after bar 9 is brought to its place and subsequent hanging of canopy 2. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CEILING OF SECTION OF MECHANIZED SUPPORT | 2002 |
|
RU2232897C1 |
ROOFING OF POWERED SUPPORT UNIT | 1999 |
|
RU2169267C1 |
POWERED SUPPORT SECTION | 0 |
|
SU1060795A1 |
CANOPY OF POWER MINE SUPPORT UNIT | 0 |
|
SU1460323A1 |
COVERING POWERED SUPPORT UNIT | 0 |
|
SU1705587A1 |
0 |
|
SU206487A1 | |
MECHANISED SECOND WORKING COMPLEX | 2013 |
|
RU2526074C2 |
POWER SUPPORT UNIT | 0 |
|
SU1276823A2 |
POWERED SUPPORT SECTION | 0 |
|
SU1102976A1 |
0 |
|
SU480824A1 |
Authors
Dates
1995-04-30—Published
1985-05-23—Filed