FIELD: mining industry. SUBSTANCE: prior to treatment, source of pressure pulses and transducer for registration of amplitude of pressure pulses are moved from nonperforated part of well along filter, and pressure pulse amplitude is measured in source zone. Relation Pf(H)/Pк, is determined, where Pf(H) and Pк are amplitudes in filter interval at depth H and in well nonperforated part, respectively. Then, permeability of different intervals of filter is estimated, and well is treated with pressure pulses with consideration of information obtained. Periodically during treatment, measurements of pressure pulse amplitudes are repeated in source zone. Completion of treatment is estimated by stabilization of values of said relation. Method allows considerable increase of treatment selectivity and reduces its terms. EFFECT: higher efficiency due to revealing filter intervals of low permeability with simultaneous control of the process of restoration of permeability. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
GEOTECHNICAL WELL PNEUMATIC AND PULSED STIMULATION TOOL | 2006 |
|
RU2331763C1 |
PROCEDURE FOR PREVENTION OF BEHIND-CASING FLOW FROM NON PERFORATED FORMATION INTO INTERVAL OF PERFORATION | 2009 |
|
RU2394987C1 |
METHOD FOR COMPLEX WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2261986C1 |
METHOD FOR UNDERGROUND LEACHING OF MINERALS | 1988 |
|
SU1639129A1 |
APPARATUS FOR TREATING WELL PREFERABLY BY PNEUMATIC PULSES | 0 |
|
SU977730A1 |
METHOD OF DEMUDDING BOTTOM-HOLE ZONE AND INTERHOLE SPACE OF HOLES FOR MINING OF RARE METALS BY METHOD OF UNDERGROUND LEACHING | 1998 |
|
RU2162147C2 |
WELL AND WELL OPERATION | 2000 |
|
RU2190064C2 |
METHOD FOR STIMULATION OF WATER YIELD OF WATER-BEARING HORIZONS VIA PRODUCTION WELLS | 2007 |
|
RU2344275C1 |
METHOD OF INCREASE OF WELL PRODUCTIVITY | 2001 |
|
RU2211919C2 |
METHOD INCREASING PRODUCTIVITY OF HYDROGEOLOGICAL WELLS AND GEAR FOR ITS IMPLEMENTATION | 1997 |
|
RU2120031C1 |
Authors
Dates
1995-07-25—Published
1988-07-05—Filed