FIELD: civil engineering. SUBSTANCE: air-convection thermal pile comprises sealed tubular casing 1 partly embedded into the ground and circulating pipe 2 installed coaxially in said casing. The casing is partly filled with water. The amount of water poured into the thermal pile is not over 5 kg per 1 sq.m of internal surface of the surface part of the casing with the optimum range being 1 ± 0.5 kg per 1 sq.m. EFFECT: higher operating efficiency of thermal pile. 2 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| THERMAL PILE | 1988 |
|
SU1558060A1 |
| THERMOPILE FOR BRIDGE SUPPORTS | 2011 |
|
RU2470114C2 |
| MOORING EMBANKMENT | 1997 |
|
RU2171873C2 |
| THERMAL PILE | 0 |
|
SU837999A1 |
| HEAT-FORMED PIPE | 0 |
|
SU1028775A1 |
| THERMAL PILE | 0 |
|
SU850804A1 |
| METHOD OF SETTING GEODETIC BENCH MARK IN WATER RESERVOIRS AND GEODETIC BENCH MARK THEREFOR | 0 |
|
SU1383094A1 |
| THERMAL PILE | 0 |
|
SU685761A1 |
| HEAT PILE | 0 |
|
SU855121A1 |
| THERMOPILE | 0 |
|
SU1749386A1 |
Authors
Dates
1995-11-20—Published
1989-10-23—Filed