METHOD FOR DETERMINATION OF SUPPORTING POWER OF PILE MODELS Russian patent published in 1994 - IPC

Abstract RU 2005852 C1

FIELD: bases and foundations. SUBSTANCE: method includes placing of ground and pile model into chamber and application to chamber of side and axial loads. Used as ground is model of materials varying its hermetic parameters under action of electric field, e. g. , piezoelectrics. Pile model, first, is mechanically pressed with force constant in height but different or, similar to each separate side face. Pressing force is calculated depending on actual weakest ground layer, temperature, humidity and other factors. Then, applied to ground model is electric field different in strength in height of pile model to ensure different values of pressure due to properties of ground model material. Value of field is varied with same or different regularities. EFFECT: higher efficiency. 2 cl, 5 dwg

Similar patents RU2005852C1

Title Year Author Number
DEVICE FOR DETERMINATION OF SUPPORTING POWER OF PILE MODELS 1990
  • Figurovskij E.N.
  • Lolaev A.B.
RU2005851C1
PILE AND METHOD OF ITS INSTALLATION INTO PERMAFROST SOIL 2010
  • Popov Aleksandr Petrovich
RU2441116C1
METHOD TO MANUFACTURE PILE FOUNDATION FOR PERMAFROST SOIL 2011
  • Kuz'Min Georgij Petrovich
  • Chzhan Rudol'F Vladimirovich
  • Remizov Vasilij Andreevich
RU2469150C1
METHOD FOR DETERMINING THE SPECIFIC RESISTANCE FORCES ON THE SIDE SURFACE OF THE FOUNDATION OF FROZEN SOILS AT DIFFERENT TEMPERATURES IN THE PROCESS OF THAWING AND APPARATUS FOR IMPLEMENTATION THEREOF 2020
  • Vlasov Aleksandr Nikolaevich
  • Korolev Mikhail Vladimirovich
  • Volkov-Bogorodskij Dmitrij Borisovich
RU2761782C1
MULTIBLADE SCREW PILE (VERSIONS) 2018
  • Zhukov Roman Vyacheslavovich
  • Perepelov Kirill Vasilevich
  • Novikov Roman Sergeevich
RU2725348C2
DRILLING-AND-DRIVING METHOD FOR PILE FOUNDATION ERECTION IN PERMAFROST GROUND 2006
  • Minkin Mark Abramovich
  • Dashkov Aleksandr Grigor'Evich
  • Filippov Oleg Grigor'Evich
  • Suvorin Aleksej Vasil'Evich
  • Vasilenko Sergej Ivanovich
  • Kolchanov Igor' Vital'Evich
  • Osokin Aleksej Borisovich
  • Popov Aleksandr Petrovich
RU2320821C1
METHOD OF DETERMINING FORCES OF NEGATIVE FRICTIONS IN TESTING PILES IN THAWING GROUND 0
  • Eroshenko Vladimir Nikolaevich
  • Krasilnikov Mikhail Nikolaevich
SU1571132A1
METHOD OF INSTALLING TUBULAR PILE IN PERMANENTLY FROZEN EARTH 2007
  • Gorelov Anatolij Sergeevich
  • Voinov Vladimir Viktorovich
  • Sibirev Aleksandr Vladimirovich
  • Shevchenko Ivan Alekseevich
  • Khafizov Famil' Timerkhanovich
  • Korneev Valerij Pavlovich
  • Targuljan Jurij Oganesovich
  • Gokhman Maks Rafailovich
RU2349707C1
METHOD OF SINKING TUBULAR PILE INTO PERMAFROST GROUND 1996
  • Mikhajlov N.V.
  • Pecherkin A.N.
  • Osokin A.B.
  • Popov A.P.
  • Reshetnikov L.N.
  • Gokhman M.R.
  • Fedorovich D.I.
  • Targuljan Ju.O.
RU2109881C1
METHOD FOR SEPARATE DETERMINATION OF THE BEARING CAPACITY OF A PILE AND APPARATUS FOR IMPLEMENTATION THEREOF 2020
  • Vlasov Aleksandr Nikolaevich
  • Korolev Mikhail Vladimirovich
RU2761784C1

RU 2 005 852 C1

Authors

Lolaev A.B.

Figurovskij E.N.

Dates

1994-01-15Published

1990-08-08Filed