FIELD: hydrogeological investigations in wells. SUBSTANCE: well interval with length l1 is shutoff by plug. Water is injected in this interval at preset head H. Steady water consumption Q1 is determined. Length of shutoff interval is measured up to length l2. Water is injected again at same head H and its steady consumption Q2 is determined. Specific water absorption is determined by formula . EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINATION OF ROCK FILTRATION PROPERTIES | 1991 |
|
RU2012795C1 |
METHOD OF CHECKING RELIABILITY OF ISOLATION OF WELL INTERVAL IN TEST PUMPING-IN OF WATER | 0 |
|
SU1390350A1 |
METHOD OF DETERMINATION OF FILTRATION CHARACTERISTICS OF BEDROCK OF WATER-DEVELOPMENT WORKS | 1991 |
|
RU2021588C1 |
METHOD FOR EVALUATION OF IRREGULARITY IN DISTRIBUTION OF ABSORBING CAPACITY OF ROCK MASS | 1992 |
|
RU2041358C1 |
METHOD FOR FRACTURED ZONE BOUNDARY DETERMINATION IN UNDERWORKED ROCK MASSIF | 2005 |
|
RU2281393C1 |
PLUG | 0 |
|
SU750040A1 |
DEVICE FOR DEVELOPMENT OF DEPOSIT OF HIGH-VISCOSITY OIL OR BITUMEN | 2011 |
|
RU2483204C1 |
DEVICE TO ISOLATE WELL INTERVAL UNDER TEST | 2005 |
|
RU2278948C1 |
METHOD FOR ELIMINATING LEAKS AND INCREASED FILTRATION OF SOIL HYDRAULIC STRUCTURES | 2020 |
|
RU2754380C1 |
CRACK HYDRAULICK CHARACTERISTIC DETERMINATION METHOD | 0 |
|
SU1048411A1 |
Authors
Dates
1994-01-15—Published
1990-12-06—Filed