FIELD: drilling. SUBSTANCE: method includes isolation of tested well interval. Located on entire side surface of said interval is filtering elastic screen. Fluid is injected into said interval at preset pressure. Steady consumption of fluid by rock is measured. Then, added to injected fluid is disposed material and injection is continued. Upon completion of injection, the filtering scree is withdrawn from well. Subject to measurement is area of figures with intensive accumulation of dispersed material settled on screen. Said area is used to estimate sectional area of filtration channels. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINATION OF WATER ABSORPTION BY HARD ROCKS | 1990 |
|
RU2005878C1 |
METHOD OF CHECKING RELIABILITY OF ISOLATION OF WELL INTERVAL IN TEST PUMPING-IN OF WATER | 0 |
|
SU1390350A1 |
METHOD FOR ELIMINATING LEAKS AND INCREASED FILTRATION OF SOIL HYDRAULIC STRUCTURES | 2020 |
|
RU2754380C1 |
METHOD FOR IMPROVING OPERATING PROPERTIES OF HYDRAULIC STRUCTURE FOOT | 2000 |
|
RU2172801C1 |
METHOD OF BEDS ISOLATION | 0 |
|
SU1716089A1 |
METHOD FOR COMPLETION OF WELL CONSTRUCTION | 1998 |
|
RU2134341C1 |
METHOD FOR MAKING A BOTTOMHOLE FILTER | 2005 |
|
RU2288351C1 |
METHOD OF DEVELOPMENT OF AN OIL POOL | 2002 |
|
RU2231631C1 |
CRACK HYDRAULICK CHARACTERISTIC DETERMINATION METHOD | 0 |
|
SU1048411A1 |
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2011 |
|
RU2482272C2 |
Authors
Dates
1994-05-15—Published
1991-01-08—Filed