FIELD: gas and oil production. SUBSTANCE: gear for separation of sad and gas from crude oil in well has branch pipe with radial holes and bottom, lifting pipe for pump put into branch pipe to form ring space. Coupling is located in upper part of branch pipe. It has ducts to communicate ring space with outer medium. Branch pipe is rigidly connected to lifting pipe with the aid of coupling. Branch pipe has length providing for oil pressure differential of 1.0-2.5 MPa. Ducts are shut with valves. Radial holes of branch pipe are made at distances 1/10 - 1/12 of length of branch pipe from coupling. Lifting pipe is installed with its lower end at distance 1/7 - 1/15 of length of branch pipe from its bottom. EFFECT: improved separation of sand and gas thanks to simplification of design and enhanced reliability. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
GRAVITATIONAL GAS SEPARATOR | 2011 |
|
RU2473801C1 |
PNEUMATIC AND HYDRAULIC GAS LIFT VALVE | 0 |
|
SU1768751A1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL AND EQUIPMENT FOR ITS IMPLEMENTATION | 2011 |
|
RU2451164C1 |
METHOD AND DEVICE FOR WELL FLUSHING | 2009 |
|
RU2405914C1 |
OIL WELL PUMPING UNIT WITH PACKER FOR EXTRACTING OIL UNDER ABNORMAL CONDITIONS | 2009 |
|
RU2412335C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
METHOD OF BOREHOLE TRANSFER AND UNIT FOR TRANSFER OF LIQUID FROM UPPER WELL FORMATION TO LOWER ONE WITH FILTRATION | 2011 |
|
RU2485293C1 |
METHOD AND EQUIPMENT FOR OPTIMISATION OF FORMATION FLUID MINING PROCESS OR MAINTENANCE OF FORMATION PRESSURE | 2012 |
|
RU2501937C1 |
Authors
Dates
1994-01-30—Published
1992-08-24—Filed