METHOD AND EQUIPMENT FOR OPTIMISATION OF FORMATION FLUID MINING PROCESS OR MAINTENANCE OF FORMATION PRESSURE Russian patent published in 2013 - IPC E21B43/00 E21B33/00 

Abstract RU 2501937 C1

FIELD: oil and gas industry.

SUBSTANCE: method involves lowering to a well of underground equipment layout, installation of a packer or an anchor, and operation of the layout. According to the invention, the layout is lowered to the well. When design depth is reached, the packer or the anchor is installed at the specified interval by unloading of the weight of pipe string, the first mark is made on the pipe string at the level of a flange of a wellhead tap, the pipe string is lifted a little from the first mark by a certain value, the pipe string is lowered to the first mark, and packer or anchor installation is performed. The pipe string is pulled to the specified value, the second mark is made on the pipe string at the level of the flange of the wellhead tap, the packer or the anchor is removed by pulling the pipe string, distance from upper coupling of the pipe string to the second mark and distance between the first and the second marks is measured. The pipe string is fitted by means of connection pipes or installation place of the packer or the anchor is changed so that runout of upper thread of an adapter is at the level of the second mark. Seizure is performed by means of a slider under upper coupling of the pipe string, the coupling is disconnected from the stock, on bridges there inserted is the device assembled with the adapter into a feedthrough hole of a face plate, and its movement throughout the stock length is checked. When there is not enough device stock length, the stock is elongated by means of a connection pipe, the coupling and stock are connected to each other, a ball is placed in the inner cavity of the device, a swivel head is screwed into the coupling, and the face plate is suspended by means of a sling to a hook block. Seizure is performed by means of an elevator under the coupling of the device assembled together with the adapter and the face plate. On upper coupling of the pipe string there threaded is the adapter assembled with the device and freely moving on the device with the face plate, the pipe string is lifted a little, a mark is made on it, at the distance from runout of upper thread of the adapter, which is equal to distance between the first and the second marks, repeated installation of the packer or the anchor is performed. The pipe string is pulled till the outlet of upper thread of the adapter above the flange of wellhead tap, a face plate is screwed on upper thread of the adapter, the face plate is lowered onto the flange of wellhead tap and the wellhead is sealed. Pressure of certain value is created in inner cavity of the device through the swivel head, under action of which a piston overcomes resistance of a spring ring and is moved downwards so that latches are released. The pipe string is pulled for release of latches engaged with the adapter, and the device is removed from the adapter.

EFFECT: possibility of pulling the pipe string over proper weight so that sealing of the well head is provided.

2 cl

Similar patents RU2501937C1

Title Year Author Number
INSTALLATION TO PREVENT FORMATION OF SAND PLUGS 2023
  • Bragin Dmitrii Viktorovich
  • Zairov Bulat Foatovich
RU2807365C1
WELL PUMPING UNIT WITH ANCHOR UNIT FOR PIPELESS OPERATION OF SMALL-DIAMETER WELLS 2020
  • Tretyakov Oleg Vladimirovich
  • Mazein Igor Ivanovich
  • Merkushev Sergej Vladimirovich
  • Krasnoborov Denis Nikolaevich
  • Dulesov Aleksej Anatolevich
  • Polezhaev Roman Mikhajlovich
  • Kamenskikh Stanislav Arkadevich
  • Khodyrev Dmitrij Aleksandrovich
RU2740375C1
INSTALLATION FOR SIMULTANEOUS SEPARATE EXTRACTION AND INJECTION 2019
  • Ivanov Vladimir Aleksandrovich
  • Chernyshov Konstantin Igorevich
RU2724712C1
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) 2011
  • Aminev Marat Khusnullovich
  • Lukin Aleksandr Vladimirovich
RU2464413C1
LANDING FOR DUAL PRODUCTION AND INJECTION 2015
  • Politov Mikhail Anatolevich
  • Panachev Mikhail Vasilevich
  • Orlov Andrej Yurevich
  • Bondar Aleksej Fedorovich
RU2598948C1
WELL PUMPING PLANT FOR INJECTION OF FORMATION WATER INTO OIL-BEARING FORMATION 2000
  • Ibragimov N.G.
  • Zakirov A.F.
  • Khaliullin F.F.
  • Dzhafarov Mirzakhan Atakishi Ogly
  • Minnullin R.M.
  • Rakhmatullin D.K.
RU2162964C1
UNIT FOR DUAL BED OPERATION IN ONE CHINK 2009
  • Khisamov Rais Salikhovich
  • Shafigullin Rinat Il'Dusovich
  • Islamov Renal' Rifkatovich
  • Vakhitov Il'Shat Damirovich
  • Zhelonkin Aleksandr Leonidovich
  • Sablin Igor' Georgievich
  • Bikchurin Ramil' Faritovich
RU2387809C1
INSTALLATION FOR SIMULTANEOUS SEPARATE OPERATION OF FOUR OIL FORMATIONS 2009
  • Ibragimov Nail' Gabdulbarievich
  • Valeev Mudair Khajevich
  • Gil'Fanov Rustam Anisovich
  • Gil'Fanov Ruslan Anisovich
  • Akhmetshagiev Marat Fanisovich
  • Akhmetshagiev Ruslan Fanisovich
RU2388935C1
PUMPING UNIT FOR EXPLOITATION OF FORMATIONS COMPLICATED BY SAND PRODUCTION WITH RESERVOIR PRESSURE GROWING FROM BOTTOM TO TOP 2023
  • Nuriakhmetov Lenar Nafisovich
RU2799221C1
UNIT FOR DUAL BED OPERATION IN WELL 2012
  • Mamakov Anatolij Vasil'Evich
  • Davletov Il'Giz Jasavievich
  • Tukhvatullin Ruslan Musovich
RU2517304C2

RU 2 501 937 C1

Authors

Aminev Marat Khusnullovich

Lukin Aleksandr Vladimirovich

Dates

2013-12-20Published

2012-05-05Filed