FIELD: hydraulic engineering. SUBSTANCE: junction connecting earth dam with concrete structure includes antifiltering diaphragms 1 and metal pipes 2 placed vertically and containing spaces to house vibration source 3. Each diaphragm 1 is water-tight connected with one side face to concrete abutment 4 and with other face - to pipe 2. Diaphragm 1 and pipes 2 are brought to bottom of water confining stratum 6. Width "a" of each diaphragm satisfy condition a<D-d/2, where D is diameter of earth cylinder of dam subject to calculated shaking with source of vibrations; d is outer diameter of metal pipe. EFFECT: reduced cost and simplified design of earth dam. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIT OF GROUND DAM COUPLING WITH CONCRETE STRUCTURE | 2010 |
|
RU2418133C1 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE STRUCTURE | 2010 |
|
RU2415996C1 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE OVERFLOW WEIR | 2011 |
|
RU2448214C1 |
UNIT FOR JUNCTION OF EARTH DAM WITH CONCRETE STRUCTURE | 2007 |
|
RU2373330C2 |
SOIL NON-HOMOGENUOUS FILL DAM | 2008 |
|
RU2377363C1 |
METHOD FOR CONSTRUCTION OF EARTH DAM | 1991 |
|
RU2005843C1 |
GROUND DAM ON PERMAFROST FOUNDATION | 2011 |
|
RU2453655C1 |
EARTH DAM | 2001 |
|
RU2207428C2 |
GROUND HETEROGENEOUS ROCK-FILL DAM | 2008 |
|
RU2376416C1 |
RIVERBED-DIVERSION STRUCTURE OF SEASONAL WATERWAY ON PERMAFROST | 2008 |
|
RU2382139C1 |
Authors
Dates
1994-02-15—Published
1992-02-11—Filed