FIELD: construction.
SUBSTANCE: coupling unit comprises a coupling abutment made of concrete and a prism made of a cohesive soil. The prism is located within the borders of the ground dam in the upper part of the coupling unit. Within the borders of the coupling unit the surface of the coupling abutment at the side of the ground dam is coated with a geomembrane attached to it and a bentonite mat. The coupling abutment and the prism comprise inside them hollow microballs from compounds containing silicon, which prevent freezing of the coupling abutment in the coupling unit for its entire thickness at the side of the overflow weir and at the side of the ground dam crest.
EFFECT: increased operational reliability.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIT OF GROUND DAM COUPLING WITH CONCRETE STRUCTURE | 2010 |
|
RU2418133C1 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE STRUCTURE | 2010 |
|
RU2415996C1 |
WATER ENGINEERING SYSTEM ON PERMAFROST SOILS | 2010 |
|
RU2416692C1 |
SOIL NON-HOMOGENUOUS FILL DAM | 2008 |
|
RU2377363C1 |
JUNCTION CONNECTING EARTH DAM WITH CONCRETE STRUCTURE | 1992 |
|
RU2007511C1 |
GROUND HETEROGENEOUS ROCK-FILL DAM | 2008 |
|
RU2376416C1 |
WATERWORKS FACILITY AT WATERWAY OF SEASONAL ACTION UNDER CONDITIONS OF PERMAFROST SOILS | 2010 |
|
RU2424397C1 |
OPEN SPILLWAY ON NON-ROCK FOUNDATION | 2008 |
|
RU2375520C1 |
WATER-ENGINEERING SYSTEM ON PERPETUALLY FROZEN SOILS | 2008 |
|
RU2374387C1 |
WATER-ENGINEERING SYSTEM AT WATERCOURSE OF SEASONAL ACTION UNDER CONDITIONS OF PERMAFROST SOILS, COOLING UNIT AND METHOD TO OPERATE WATER-ENGINEERING SYSTEM | 2010 |
|
RU2418134C1 |
Authors
Dates
2012-04-20—Published
2011-02-07—Filed