FIELD: oil production. SUBSTANCE: with space of string of pump-and-compressor pipes open in mouth of well bursts of gas and extruding fluid are pumped into well clearance by turns. Before pumping of burst of extruding fluid into well clearance thickened fluid in volume of 0.2-0.3 of volume of fluid is injected. Pumping of bursts of fluid and gas is carried out with equal rate of feed. EFFECT: reduced time of putting well into production. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ACID TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1993 |
|
RU2078203C1 |
METHOD FOR REMOVING SAND-CLAY PLUG IN WELL AND ITS DEVELOPMENT UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2013 |
|
RU2544944C2 |
WELL DEVELOPMENT METHOD | 0 |
|
SU1765375A1 |
GAS-HYDRATE MINING COMPLEX | 1991 |
|
RU2026999C1 |
METHOD FOR ISOLATION OF HIGHLY PERMEABLE ROCKS | 1991 |
|
RU2018630C1 |
METHOD OF TREATING BOTTOM-HOLE ZONE OF RESERVOIR | 1994 |
|
RU2087694C1 |
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2724705C1 |
METHOD FOR COMPLETION OF WELL CONSTRUCTION | 1998 |
|
RU2134341C1 |
PROCESS OF ISOLATION OF INFLOW OF STRATAL WATER | 2000 |
|
RU2186935C2 |
PROCESS OF BOTTOM-HOLE TREATMENT | 2002 |
|
RU2222697C1 |
Authors
Dates
1994-02-15—Published
1991-02-25—Filed