METHOD FOR PLUGGING-UP WELLS Russian patent published in 1994 - IPC

Abstract RU 2009311 C1

FIELD: plugging-up wells. SUBSTANCE: plugging device is lowered into well with its discharge hole positioned against lower boundary of interval to be plugged, then, pulsator is engaged. Hydraulic pressure pulses formed by pulsator in above-piston space are transmitted through piston to grouting mortar in space and through it to plug which moves downward under action of pulse pressure that is accompanied by shearing members and displacement downwards of slider and case together with plug. In so doing, case comes off collar which is set to working position due to its flexible forces. Further on, grouting mortar under action of pressure executes pulse motion from working hollow through hole to well to fill fractures, pores and caverns in rocks. Upon completion of plugging of interval h, the device is lifted in well bore to bypass drilling mud from hole clearance above packer through channel and hole in seat, that excludes piston effect. Lifting is carried out step by step alternating it with stops. To decrease consumption of plugging materials, during lifting of plugging device between stops, mud injection may be discontinued. To increase reliability of well plugging-up with the plugging device having container, subject to registration is moment of complete forcing of grouting mortar from container and packer position corresponding to this moment, and duration t0 of last stop, and if collar is found at the moment of complete forcing out of grouting mortar form container below the interval roof and/or stop duration t0 is t0<t, run is repeated. When grouting of intervals of large thickness by several runs of grouting device with container, registered during each run are moment of completion of forcing out of grouting mortar from container and position of packer in plugged interval corresponding to this moment, and duration t0 of last stop of plugging device. And when executing next run of plugging device, its lowering is discontinued after installation of packer at distance h≅ l above roof of interval plugged during previous run if duration of last stop was equal to t0≥ t, or after packer is installed at depth at which it was at the moment of complete forcing out of grouting mortar from container during previous run, when duration of last stop was equal to t0<t. EFFECT: higher efficiency. 4 cl, 2 dwg

Similar patents RU2009311C1

Title Year Author Number
PLUGGING DEVICE 2003
  • Lobanov B.S.
RU2235191C1
PLUGGING-BACK DEVICE 0
  • Lobanov Boris Semenovich
SU1740626A1
METHOD FOR ISOLATION OF LOST-CIRCULATION FORMATIONS IN WELLS AND DEVICE FOR ITS REALIZATION 1990
  • Lobanov B.S.
RU2017934C1
WELL PLUGGING DEVICE 1992
  • Lobanov B.S.
RU2066732C1
PACKING PLUGGING ARRANGEMENT 0
  • Lobanov Boris Semenovich
SU1121393A1
PLUGGING DEVICE 0
  • Lobanov Boris Semenovich
SU1808994A1
PLUGGING DEVICE 1992
  • Lobanov B.S.
RU2057899C1
PLUGGING DEVICE 0
  • Lobanov Boris Semenovich
SU1602974A1
PLUGGING DEVICE 1991
  • Lobanov B.S.
RU2085699C1
PLUGGING-BACK DEVICE 1990
  • Lobanov B.S.
RU2013522C1

RU 2 009 311 C1

Authors

Lobanov Boris Semenovich

Dates

1994-03-15Published

1991-03-14Filed