FIELD: mining industry. SUBSTANCE: mining is performed in stages with forming at each stage of mineral extraction zones in the open-cut contours and with temporary stockpiling of overburden rocks. The pioneer fill is made up to the opposite walls of the open-cut to the height of the step. From this fill the dump is filled. As the mining proceeds to the second stage contour, an enclosing an a protection fills are formed along said contour till the opposite walls of the open-cut, with forming the enclosing fill and filling the dump in such a way as to produce a common step surface. On the surface of the formed step are formed the enclosing and protection fills of the next step of the dump. These operations are repeated. After the direction of mining changes, the pioneer fill is made on the mined-out horizon, then the second stage dump is formed in the same way as for the first stage dump. EFFECT: improved mining technique. 2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD FOR MINING STEEPLY-DIPPING ELONGATED DEPOSITS | 1995 |
|
RU2097561C1 |
METHOD FOR OPEN EXTRACTION OF STEEP-FALLING DEPOSITS WITH INTERNAL DUMP-FORMING | 2002 |
|
RU2246620C2 |
METHOD OF OPEN MINING OF STEEP OBLONG DEPOSITS | 2011 |
|
RU2490462C2 |
METHOD OF OPENCAST MINING OF STEEP ELONGATED MINERAL DEPOSITS | 1999 |
|
RU2171377C2 |
METHOD OF STRIP MINING OF STEEP DEPOSITS | 0 |
|
SU1155755A1 |
PROCESS OF OPENCAST MINING OF STEEPLY DEEPING STRETCHED-OUT MINERAL DEPOSITS | 2002 |
|
RU2224109C2 |
METHOD FOR FINISHING OPENCAST IN MINING STEEPLY DIPPING MINERAL DEPOSITS | 0 |
|
SU1788251A1 |
METHOD OF DUMP FORMATION | 1997 |
|
RU2122117C1 |
METHOD OF FORMING AN INTERNAL-EXTERNAL DUMP OF OVERBURDEN ON A PIT EDGE | 2024 |
|
RU2822182C1 |
Authors
Dates
1994-05-30—Published
1989-07-28—Filed