FIELD: oil and gas producing industry. SUBSTANCE: temperature is determined for well reservoir conditions. The well is provided with a bottom-hole choke. A hydrate forming gas is injected into the formation, the gas being compressed to the pressure higher than those of the formation. The gas injected through the bottom-hole choke. The gas flow rate is determined from a dependance presented in the description. The gas flow rate ensures the bottom-hole temperature reduction below the hydrate forming temperature. Then the pressure applied to the wellhead is increased. The gas injection is stopped. The bottom-hole area is filled with a foam and the borehole - with the well killing fluid. EFFECT: enlarged operating capabilities.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEANING BOTTOM-HOLE FORMATION ZONE | 1989 |
|
SU1835136A3 |
WELL-CLOSING METHOD | 0 |
|
SU724688A1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD OF FINISHING WELLS | 0 |
|
SU1418468A1 |
SAND CARRIER FLUID FOR HYDRAULIC FRACTURING OF FORMATION | 1993 |
|
RU2078905C1 |
METHOD OF ISOLATING FORMATION WATER | 0 |
|
SU1021763A1 |
METHOD FOR CONSTRUCTION OF GRAVEL PACKING AND DEVICE FOR ITS REALIZATION | 1990 |
|
RU2023140C1 |
METHOD OF TEMPORARY ISOLATION OF PRODUCING FORMATION WHEN PERFORMING REPAIR WORK IN WELL | 0 |
|
SU1620608A1 |
COMPOSITION FOR TEMPORARY SELECTE OF ISOLATION OF HIGHLY PERMEABLE INTERMEDIATE SEAMS | 0 |
|
SU945391A1 |
METHOD FOR WELL CEMENTATION | 2002 |
|
RU2232258C2 |
Authors
Dates
1994-05-30—Published
1991-07-19—Filed