FIELD: civil engineering. SUBSTANCE: concrete mortar is filled to the level of loading opening, then casing pipe is plugged at the level of said opening and knocked down until wider foot is formed in the lower part of well. Then casing pipe is withdrawn by vibratory method. Plug has the form of disc secured on horizontal axle with a provision for turning through 180 deg. Disc axle carries pulley on external side of pipe while disc retainers are installed horizontally on internal walls of pipe. EFFECT: higher efficiency. 2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MANUFACTURE CLUB-FOOTED PILES | 1992 |
|
RU2037602C1 |
METHOD OF CAST-IN-PLACE PILE MAKING | 2000 |
|
RU2193625C2 |
DEVICE FOR ERECTING CAST-IN-PLACE PILE | 1992 |
|
RU2054091C1 |
COMBINED METHOD FOR CAST-IN-PLACE PILE PRODUCTION | 2003 |
|
RU2244066C1 |
METHOD OF MAKING CAST-IN-PLACE PILES WITH ROOT-LIKE MEMBERS AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2163279C2 |
METHOD OF PILE FORMING IN PRELIMINARY FORMED WELL | 2002 |
|
RU2231596C2 |
METHOD TO MANUFACTURE CAST-IN-PLACE PILES | 2011 |
|
RU2466239C1 |
METHOD OF CONSTRUCTING CAST-IN-PLACE PILE | 0 |
|
SU1278404A1 |
A METHOD OF MANUFACTURING THICKLY RAMMED PACKED PILES AND DEVICE THEREFOR | 0 |
|
SU1668558A1 |
CONTINUOUS HOLLOW DIE FOR INSTALLATION OF CAST-IN-PLACE PILES BY INDENTATION METHOD AND METHOD OF CAST-IN-PLACE PILE INSTALLATION BY MEANS OF CONTINUOUS HOLLOW DIE FOR CAST-IN-PLACE PILES BY INDENTATION | 2023 |
|
RU2817367C1 |
Authors
Dates
1994-06-15—Published
1992-01-03—Filed