FIELD: construction engineering. SUBSTANCE: method includes drilling of hole, supply of solidifying material into hole and initiation of high-voltage discharges in supplied solidifying material by working discharger with variation of pulse energy, motion of discharger in hole and formation of widened sections. Novelty consists in introduction of waterproof shell into hole prior to supply of solidifying material and its destruction under effect of high-voltage discharges. Pulse energy is not changed during passage of frost zone. EFFECT: increased load-carrying capacity cast-in-place piles, extended field of application, particularly, in sand ground with low moisture content. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED METHOD FOR CAST-IN-PLACE PILE PRODUCTION | 2003 |
|
RU2244066C1 |
CAST-IN-PLACE PILE FORMING METHOD | 2004 |
|
RU2256029C1 |
METHOD FOR MANUFACTURE OF BORE-INJECTION PILE IN SEASON FROZEN GROUND | 1999 |
|
RU2150550C1 |
PROCESS OF INSULATION OF STRUCTURES EXPOSED TO MOISTURE | 2001 |
|
RU2206675C2 |
METHOD FOR CAST-IN-PLACE PILE FORMING | 2003 |
|
RU2255179C1 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
PROCEDURE EVALUATING QUALITY OF HYDRAULIC INSULATION | 2001 |
|
RU2203481C2 |
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
METHOD OF PILE PRODUCTION | 2017 |
|
RU2654097C1 |
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
Authors
Dates
2002-11-27—Published
2000-03-22—Filed