FIELD: civil engineering. SUBSTANCE: method involves drilling holes in foundation ground, filling them with friable material and making compacted cushion containing hole-filling material. Cushion and end holes are disposed beyond the building contour. Hole-filling material is placed in the cushion as an intermediate layer. Said layer and upper part of cushion on top of it are made after drilling of holes. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REINFORCING FOUNDATION BASE | 1991 |
|
RU2014392C1 |
METHOD OF ARRANGING A GROUNDWORK IN THE PERMAFROSTS | 1991 |
|
RU2034955C1 |
METHOD OF PREPARING FOUNDATIONS | 0 |
|
SU1620535A1 |
METHOD OF ERECTING FOUNDATION ON SAGGING GROUND | 0 |
|
SU1557265A1 |
METHOD FOR CONSTRUCTION OF ANCHOR FASTENING | 1991 |
|
RU2014388C1 |
METHOD OF CONSTRUCTING PILE FOUNDATION | 0 |
|
SU1305255A1 |
METHOD FOR PREPARATION OF BEDS | 0 |
|
SU1788147A1 |
PILE FOUNDATION | 0 |
|
SU1293281A1 |
METHOD OF CONSTRUCTION OF PILES FOUNDATION CLOSE TO EXISTING BUILDING | 1992 |
|
RU2091541C1 |
METHOD OF CONSOLIDATING SAGGING SOIL | 0 |
|
SU1052623A1 |
Authors
Dates
1994-06-15—Published
1991-06-28—Filed