FIELD: building industry. SUBSTANCE: cooling ventilation ducts are assembled, a solidified plate is created in the nearsurface area of the ground. Before the cooling ventilation ducts are assembled along all the surface of the plate, a ditch is dug up under it. A protecting layer overlapping the weakened areas is laid on the ditch bottom. The in-layers reverse loading of the ground into the ditch is exercised with the thickening of every layer. Reinforcing nets are mounted. The assembly of the cooling ventilation ducts is carried out stage by stage. EFFECT: facilitated manufacture. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING MEASURING DETECTORS WHEN TESTING STRESSED-DEFORMED CONDITION OF FROZEN SOIL | 1991 |
|
RU2029305C1 |
METHOD FOR REINFORCING FOUNDATION BASE | 1991 |
|
RU2014392C1 |
METHOD FOR CONSTRUCTION OF ANCHOR FASTENING | 1991 |
|
RU2014388C1 |
METHOD FOR CONSTRUCTING FOUNDATION FOR BUILDINGS ON SUBSIDING GROUND | 1991 |
|
RU2014394C1 |
METHOD FOR INCREASING THE CARRYING CAPACITY OF AERODROME COATINGS IN THE CONDITIONS OF SALINE PERMAFROST SOILS | 2021 |
|
RU2763640C1 |
RETAINING WALL TO BE ERECTED NEAR UNDERGROUND STRUCTURE | 0 |
|
SU637494A1 |
METHOD OF REINFORCEMENT OF DEEPENED BEARING STRUCTURE | 1991 |
|
RU2026449C1 |
METHOD OF SINKING TUBULAR PILE INTO PERMAFROST GROUND | 1996 |
|
RU2109881C1 |
DRILL-HOLE HYDRAULIC GIANT FOR MAKING SLITS IN GROUND | 1991 |
|
RU2014455C1 |
METHOD OF THERMAL STABILIZATION OF SOIL BASE OF PILE FOUNDATION OF PIPE SUPPORTS | 2015 |
|
RU2616029C1 |
Authors
Dates
1995-05-10—Published
1991-12-26—Filed