FIELD: civil engineering. SUBSTANCE: anchor spindles are driven into ground at a distance of 4-20 their diameter from one another then D.C.. is passed through spindles, and its direction is changed periodically every 0.25-6.0 h. Before placing spindles into ground, each of them is fitted with a pointed end subsequently treated with coating consisting of, wt.-%: cement, 30-5-; sodium silicate, 50-70. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTING FOUNDATION FOR BUILDINGS ON SUBSIDING GROUND | 1991 |
|
RU2014394C1 |
METHOD FOR REINFORCING FOUNDATION BASE | 1991 |
|
RU2014392C1 |
METHOD OF ARRANGING A GROUNDWORK IN THE PERMAFROSTS | 1991 |
|
RU2034955C1 |
INJECTOR FOR STRENGTHENING LOOSE ROCKS | 0 |
|
SU1827409A1 |
DRILL-HOLE HYDRAULIC GIANT FOR MAKING SLITS IN GROUND | 1991 |
|
RU2014455C1 |
METHOD OF MOUNTING MEASURING DETECTORS WHEN TESTING STRESSED-DEFORMED CONDITION OF FROZEN SOIL | 1991 |
|
RU2029305C1 |
METHOD OF ANCHORING LINING IN SOIL | 0 |
|
SU1618892A1 |
METHOD OF REINFORCEMENT OF DEEPENED BEARING STRUCTURE | 1991 |
|
RU2026449C1 |
METHOD OF ERECTING PILE | 0 |
|
SU1763574A1 |
VERTICAL PIPE DRAIN AND ANCHOR MEMBER FOR IT | 0 |
|
SU1812275A1 |
Authors
Dates
1994-06-15—Published
1991-07-30—Filed