FIELD: civil engineering. SUBSTANCE: installed in staggered order on transverse walls of hopper are deflecting plates. The last plate is disposed directly above outlet portion of housing. Side edges of a slot provided under housing in hopper bottom are connected by inclined plates with longitudinal walls. Vertical plates installed in the rear part of hopper bottom form a gap corresponding to projection of housing on hopper bottom. Deflecting plates may be spring-loaded and installed on transverse walls by means of axles. EFFECT: improved design. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PLASTIC DRAINAGE CONSTRUCTION AND DEVICE FOR METHOD IMPLEMENTATION | 2007 |
|
RU2354777C1 |
METHOD AND DEVICE FOR PLASTIC DRAINAGE SYSTEM ERECTION | 2004 |
|
RU2260091C1 |
METHOD FOR DRAINAGE INSTALLATION AND DEVICE FOR ITS REALISATION | 2011 |
|
RU2469149C1 |
NARROW-TRENCH METHOD OF HORIZONTAL DRAIN CONSTRUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2422586C1 |
HOPPER OF DRAIN LAYER | 1990 |
|
RU2017898C1 |
DRAIN TUBE LAYER | 1990 |
|
RU2014403C1 |
DRAIN LAYER HOPPER | 0 |
|
SU1714055A1 |
NARROW-DITCH DRAIN-TUBE LAYER | 2001 |
|
RU2206670C2 |
METHOD AND DEVICE FOR PLASTIC DRAIN SYSTEM CONSTRUCTION IN THE CASE OF HIGH GROUND-WATER LEVEL | 2006 |
|
RU2310037C1 |
HOPPER FOR DRAIN LAYER | 0 |
|
SU1744208A1 |
Authors
Dates
1994-06-15—Published
1991-05-21—Filed