FIELD: construction of horizontal drainage. SUBSTANCE: hopper vibration system has two side walls of receiving compartment. Walls are made of flexible ferromagnetic material. Electromagnet is installed in a spaced relation to side walls of receiving compartment. Clearance is taken up according to relation considering wall dimensions, modulus of elasticity and proportionality factor. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DRAIN TUBE LAYER | 1990 |
|
RU2014403C1 |
DRAIN LAYER HOPPER | 0 |
|
SU1714055A1 |
HOPPER OF NARROW-TRENCH DRAIN-TUBE LAYER | 1991 |
|
RU2014404C1 |
METHOD FOR CONSTRUCTION OF DRAINAGE SYSTEM IN WATER-LOGGED SOILS | 1992 |
|
RU2017893C1 |
HOPPER FOR DRAIN LAYER | 0 |
|
SU1744208A1 |
METHOD OF PREPARING DRAIN-TUBE LAYER TO WINTER OPERATION | 1998 |
|
RU2142036C1 |
HOPPER FOR LAYING DRAIN PIPES | 0 |
|
SU910951A1 |
METHOD AND DEVICE FOR PLASTIC DRAINAGE SYSTEM ERECTION | 2004 |
|
RU2260091C1 |
VARIABLE-SPEED DRIVE | 1993 |
|
RU2108505C1 |
WORKING MEMBER OF TRENCHLESS DRAIN DUCT LAYER | 0 |
|
SU1652461A1 |
Authors
Dates
1994-08-15—Published
1990-07-06—Filed