FIELD: mining industry. SUBSTANCE: to enhance reliable estimation of standard of water-insulating work and to curtail expenditures of funds and materials for checking quality of work after injection of design amount of solution, method involves closing check valve of pressure pipeline and measuring steady residual pressure by pressure gauge. Required and sufficient value of said pressure shall be higher than, or equal to, design value found from submitted formula. EFFECT: higher efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS | 1990 |
|
RU2095574C1 |
COMPOUND FOR PLUGGING OF FLOODED FISSURED ROCKS | 1990 |
|
RU2032079C1 |
METHOD FOR QUALITY CONTROL OF GROUTING IN CONSTRUCTING LONG ANTI-FILTERING CURTAINS | 1988 |
|
SU1832845A1 |
METHOD OF ISOLATING VERTICAL MINE WORKINGS FROM SUBSOIL WATER INFLOW | 0 |
|
SU1352067A1 |
METHOD OF PROTECTING AND SUPPORTING MINE WORKING IN WATER-BEARING ROCKS | 0 |
|
SU1439249A1 |
METHOD OF PLUGGING WATER-SATURATED ROCK WITH SYSTEM JOINTING | 0 |
|
SU1573193A1 |
METHOD TO SEPARATE UNDERGROUND FIRES | 1991 |
|
RU2029875C1 |
METHOD OF PLUGGING MINE WORKINGS | 0 |
|
SU1346810A1 |
METHOD OF HYDRO-ISOLATION AND CONSOLIDATION OF MOUNTAIN-MASS WHILE TUNNELING | 0 |
|
SU1830417A1 |
METHOD OF ELIMINATING SUDDEN SURGES OF WATER TO WORKING FACE OF A WORKING BEING DRIVEN | 0 |
|
SU1401142A1 |
Authors
Dates
1994-06-15—Published
1991-03-04—Filed