FIELD: mining industry. SUBSTANCE: according to method, rock mass is frozen, and created around ice-rock mass is water-isolation plugging curtain by drilling bore-holes, injected through these bore-holes is plugging solution to effect hydraulic fracturing, injected through thus formed cracks is water-proofing material, rock is extracted, and mine shaft is strengthened. Creation of water-isolation curtain is effected after freezing of rock mass at boundary of temperature stress concentration. Plugging solution is injected through casing pipes with single-side perforation. Hydraulic fracturing is effected by plugging solution of low density, and cracks are filled with plugging solution higher density. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROLLING STANDARD OF PLUGGING IN ERECTION OF MINE WORKINGS | 1991 |
|
RU2014463C1 |
METHOD OF HYDRO-ISOLATION AND CONSOLIDATION OF MOUNTAIN-MASS WHILE TUNNELING | 0 |
|
SU1830417A1 |
METHOD OF PLUGGING WATER-SATURATED ROCK WITH SYSTEM JOINTING | 0 |
|
SU1573193A1 |
METHOD OF PROTECTING AND SUPPORTING MINE WORKING IN WATER-BEARING ROCKS | 0 |
|
SU1439249A1 |
METHOD TO SEPARATE UNDERGROUND FIRES | 1991 |
|
RU2029875C1 |
METHOD FOR ERECTION OF ANTIFILTERING CURTAIN BEHIND CONTOUR OF MINE SHAFT IN POROUS ROCKS | 0 |
|
SU1802135A1 |
COMPOUND FOR PLUGGING OF FLOODED FISSURED ROCKS | 1990 |
|
RU2032079C1 |
ELECTRODE-INJECTOR FOR CHEMICAL PLUGGING OF ROCKS | 1990 |
|
RU2061182C1 |
METHOD FOR QUALITY CONTROL OF GROUTING IN CONSTRUCTING LONG ANTI-FILTERING CURTAINS | 1988 |
|
SU1832845A1 |
METHOD OF ISOLATING VERTICAL MINE WORKINGS FROM SUBSOIL WATER INFLOW | 0 |
|
SU1352067A1 |
Authors
Dates
1997-11-10—Published
1990-10-02—Filed