FIELD: metallurgical industry. SUBSTANCE: device comprises sealed chamber and sealed charging apparatuses, and dividing wall with water-jacketed fairing. Novelty consists in provision of sealed chamber and wall with fairing which contribute to effective processing of industrial and municipal waste. Distance between fairing and gas duct is at least three distances from discharge threshold of slag siphon to fairing. Lower part of fairing is water-jacketed. EFFECT: improved design. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTINUOUS MATERIALS SMELTING IN MOLTEN BATH | 1991 |
|
RU2015171C1 |
APPARATUS FOR CONTINUOUS MELTING OF MATERIALS IN MELT | 1991 |
|
RU2033430C1 |
FURNACE FOR CONTINUOUS MELTING OF MATERIALS IN MELTED SLAG | 1993 |
|
RU2061055C1 |
METHOD OF PROCESSING SOLID WASTES IN MOLTEN SLAG | 2009 |
|
RU2451089C2 |
METHOD OF THERMAL NEUTRALISATION OF MUNICIPAL WASTE IN MELTED SLAG AND FURNANCE FOR ITS IMPLEMENTATION | 2016 |
|
RU2623394C1 |
FURNACE FOR CONTINUOUS SOLID WASTES PROCESSING IN MELT | 2016 |
|
RU2621510C1 |
FURNACE FOR CONTINUOUS PROCESSING OF MATERIAL IN MELT | 1992 |
|
RU2036384C1 |
METHOD AND DEVICE FOR PROCESSING RAW LEAD MATERIAL | 2005 |
|
RU2283359C1 |
RUBBISH INCINERATION FURNACE | 1993 |
|
RU2067727C1 |
COMPLEX FOR REWORKING SOLID DOMESTIC AND INDUSTRIAL WASTES | 1997 |
|
RU2122155C1 |
Authors
Dates
1994-06-30—Published
1991-02-28—Filed