FIELD: hoist equipment. SUBSTANCE: crane has a running frame, a bearing-rotatable part with a cargo winch, a sectional tower, a sectional boom with a cargo truck and a winch. A mounting post is positioned on the cargo truck. The cargo truck is mounted on boom guides by rollers and is held from overturning by release rollers. When the boom section is raised the cargo truck assembled with the mounting post is held on the boom by extendable locking devices. EFFECT: improved structure. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
TOWER CRANE | 0 |
|
SU1472422A1 |
TOWER CRANE | 0 |
|
SU1763348A2 |
TOWER CRANE | 1999 |
|
RU2166471C2 |
ARRANGEMENT FOR ERECTING OF TOWER CRANE | 0 |
|
SU1323521A1 |
TOWER CRANE | 2006 |
|
RU2307783C1 |
0 |
|
SU405807A1 | |
TOWER CRANE AND METHOD OF ITS MOUNTING | 1998 |
|
RU2225346C2 |
SELF-MOUNTING TOWER CRANE | 0 |
|
SU1318510A1 |
0 |
|
SU289716A1 | |
METHOD AND APPARATUS FOR DISMOUNTING TOWER CRANE | 0 |
|
SU1174368A1 |
Authors
Dates
1994-08-15—Published
1991-06-25—Filed