FIELD: maintenance of oil and gas wells. SUBSTANCE: method includes well heating, injection of saturated aqueous solution of mineral salt heated up to well temperature. Prior to injecting the aqueous solution, the well is heated to temperature. Prior to injecting the aqueous solution, the well is heated to temperature 15-30 C higher than that of enclosing rocks. Mineral salt is used in form of salt whose solubility reduces with temperature drop, e.g., ammonium chloride. EFFECT: higher efficiency. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD OF REINFORCEMENT OF LINING OF GAS WELLS | 1998 |
|
RU2166613C2 |
METHOD OF WELLS CASING AND CEMENTING | 1992 |
|
RU2068489C1 |
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE | 2000 |
|
RU2188302C2 |
METHOD OF CEMENTING WELLS | 0 |
|
SU1189998A1 |
METHOD FOR SHUTOFF OF WATER INFLOW OF BOTTOM WATER IN GAS WELLS UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 1996 |
|
RU2121569C1 |
SEALING OF PIPE AND STRING CLEARANCE | 2002 |
|
RU2223386C2 |
SEALING COMPOSITION FOR INSULATION WORK IN WELL | 2010 |
|
RU2445338C1 |
METHOD FOR ELIMINATION OF LEAKAGE OF STRINGS OF OIL AND GAS WELLS | 2014 |
|
RU2586360C1 |
METHOD OF STABILIZATION OF BOTTOM-HOLE PRODUCING FORMATION ZONES | 1999 |
|
RU2172811C2 |
Authors
Dates
1994-08-15—Published
1990-06-18—Filed