FIELD: oil and gas production. SUBSTANCE: invention deals with sealing of pipe and string clearance, especially in wells with abnormally high pressure. In compliance with invention well is killed with process fluid. String is perforated. Chaser and grouting mortar are injected. Excess of grouting mortar is forced out of well. Well is abandoned in waiting on solidification of grouting mortar. Process fluid is driven with service water under excessive pressure on formation. Then string is perforated in upper part of permeable horizon and bottom of bridge lying above. Well is blasted for flame under maximum depression, is flushed with service water under excessive pressure with regard to pressure in formation and water-soluble polymer coagulating and solidifying with contact with stratal water containing ions of polyvalent metals is pumped in. Grouting mortar is injected and driven into formation, pipe and hole clearance with preservation of excessive pressure. Mixture of cement with rheological reinforcing and especially finely divided mineral binding additive of MICRODUR type is utilized in the capacity of grouting mortar. EFFECT: prevented filtration of fluid in pipe and hole clearance, expanded functional potential of approach.
Title | Year | Author | Number |
---|---|---|---|
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD FOR MAKING A BOTTOMHOLE FILTER | 2005 |
|
RU2288351C1 |
METHODS OF ISOLATION OF THE PRODUCTIVE STRATA OVERLAPPED BY THE CASING STRINGS AND THE GROUTING MORTAR FOR ITS EXERCISE | 2005 |
|
RU2299230C2 |
WELL KILLING METHOD | 2004 |
|
RU2283942C2 |
METHOD FOR REPAIR INSULATION WORK USING SUSPENSIONS OF FINE MINERAL BINDER | 2015 |
|
RU2582143C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
COMPOSITION FOR REMEDIAL CEMENTING IN WELLS | 2015 |
|
RU2613067C1 |
METHOD FOR REVERSE CEMENTING OF CASING IN WELL | 1994 |
|
RU2067158C1 |
INFORMATIVE GROUTING MORTAR (VERSIONS) | 2011 |
|
RU2471844C1 |
Authors
Dates
2004-02-10—Published
2002-04-15—Filed