FIELD: coal industry. SUBSTANCE: coal is extracted by strips and coal dump is formed at hanging wall. Prior to forming coal dump, perforated pipeline is laid, after hardening of fill, water is supplied through pipeline under pressure to saturate, wash out dump coal and to carry pulp to working surface, forming thus hollow under cast self-cementing fill. In case of coal blocking in hollow, built up in perforated pipeline is moving front of fluid pressure. EFFECT: higher efficiency. 2 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF THICK SEAMS | 1992 |
|
RU2041355C1 |
METHOD OF INCLINED SLICING OF THICK STEEP COAL SEAM | 0 |
|
SU1705569A1 |
METHOD FOR MINING OF THICK COAL SEAMS | 1993 |
|
RU2069751C1 |
METHOD FOR MINING THICK FLAT SEAM WITH USE OF SELF-CEMENTING FILL | 0 |
|
SU1800028A1 |
METHOD FOR ROOF CONTROL IN MINING COAL SEAMS | 1992 |
|
RU2067174C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD FOR MINING THICK STEEPLY DIPPING SEAMS BY HYDRAULIC BREAKING WITH CAST SELF-CEMENTING FILL | 1993 |
|
RU2069752C1 |
METHOD OF MININNG THICK STEEP SEAMS BY HYDRAULIC TECHNIQUE | 0 |
|
SU1314063A1 |
METHOD OF MINING THICK STEEP SEAMS | 0 |
|
SU1544975A1 |
METHOD OF WORKING THICK SLOPING COAL BEDS IN DESCENTING HORIZONTAL LAYERS | 0 |
|
SU920214A1 |
Authors
Dates
1994-08-15—Published
1990-04-24—Filed