FIELD: construction of shallow foundations of residential and public buildings in firm grounds. SUBSTANCE: when forming foundation, concrete is supplied to forms simultaneously with filling of pit, and just after completion of formation the forms are withdrawn from filled pit. During formation of head or crossbar of foundation, backfill ground is partially removed along upper part of formed member to form bed for head or crossbar. EFFECT: higher efficiency. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF FLOORS IN MONOLITHIC BUILDINGS | 1992 |
|
RU2018603C1 |
METHOD FOR ERECTING MONOLITHIC BUILDING IN TUNNEL-TYPE FRAMEWORK AND FRAMEWORK FOR ERECTING MONOLITHIC BUILDING | 1992 |
|
RU2065012C1 |
METHOD FOR ERECTION OF CAST-IN-SITU BUILDINGS | 1992 |
|
RU2034121C1 |
SLIDING CONCRETE FORM | 1992 |
|
RU2040656C1 |
METHOD FOR CONSTRUCTION OF MONOLITHIC BUILDING | 1993 |
|
RU2065011C1 |
METHOD FOR SECTION-WISE ERECTION OF A MONOLITH FRAME | 1991 |
|
RU2012753C1 |
METHOD OF MOULDING OF MONOLITHIC WALLS AND FLOORS | 1993 |
|
RU2062774C1 |
METHOD OF MONOLITHIC ERECTION OF A SHALLOW FOUNDATION | 2017 |
|
RU2669320C1 |
METHOD FOR THE CONSTRUCTION OF A HYDRAULIC STRUCTURE OF A NAVAL BASE | 2021 |
|
RU2775074C1 |
METHOD OF CONSTRUCTING BRIDGE SUPPORT GRILLAGE IN RIVER WATER AREA | 2023 |
|
RU2809068C1 |
Authors
Dates
1994-04-30—Published
1991-11-27—Filed