FIELD: peat production. SUBSTANCE: method includes cutting peat blocks 2 by vertical perforation of peat field, drying of cutout blocks on perforated surface, and their gathering. Simultaneous with block cutting out, cylindrical hollows 3 are formed in blocks. Cutout blocks are laid on connector 4 of field perforated surface by arranging them in radial direction relative to place of their removal. EFFECT: higher efficiency. 2 cl, 1 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF WINNING PEAT | 0 | 
 | SU1453013A1 | 
| DEVICE FOR EXTRACTION OF WELL-STRUCTURED PEAT | 0 | 
 | SU1768759A1 | 
| METHOD OF MINING PEAT | 0 | 
 | SU941590A1 | 
| PEAT WINNING PROCESS | 0 | 
 | SU1314071A1 | 
| METHOD FOR WINTER EXTRACTION OF PERMAFROST PEAT | 2020 | 
 | RU2730071C1 | 
| METHOD OF WINNING PEAT | 0 | 
 | SU1355713A1 | 
| METHOD OF PRODUCING INITIAL PEAT MATERIAL | 0 | 
 | SU1460286A1 | 
| PEAT EXTRACTION METHOD DURING WINTER SEASON | 2019 | 
 | RU2715134C1 | 
| METHOD FOR PRODUCTION MACHINE CUT PEAT | 0 | 
 | SU1671864A1 | 
| METHOD OF PRODUCING GARDEN AND COMBUSTIBLE PEAT | 2012 | 
 | RU2499141C1 | 
Authors
Dates
1994-08-30—Published
1990-08-17—Filed