FIELD: breakage of solid rocks in quarries. SUBSTANCE: established preliminary is boundary of two conjugated blocks to be crushed. Groups of additional holes are drilled parallel to established boundary, and explosive charges, blasting means and stumping are placed in holes. Charges are initiated with ultrashort delay. Blasting is resulted in dilatation loosening of rocks in crushed blocks. Then main blast holes are drilled at high speed in broken blocks and rocks are subjected to blast crushing. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DRILLING AND BLASTING OPERATIONS AT OPEN PITS | 2013 |
|
RU2517289C1 |
METHOD FOR SHOOTING OF ORE FROM MASSIF WITH FLAKY TEXTURE | 2008 |
|
RU2379622C1 |
METHOD FOR EXPLOSIVE DESTRUCTION OF VARIOUS COHERENCE ROCK MASSIF WITH DISTRIBUTED AND SHORTENED BLASTHOLE CHARGES WITH CUMULATIVE EFFECT | 2015 |
|
RU2594236C1 |
METHOD OF EXPLOSIVE PREPARATION FOR SELECTIVE EXCAVATION OF ORE BODY AND COVERING OVERBURDEN ROCKS | 2020 |
|
RU2738331C1 |
METHOD OF BREAKING UP BY EXPLOSIVES ORE FROM SOLID MASS WITH LAYERED TEXTURE | 2013 |
|
RU2532478C1 |
METHOD FOR DETERMINATION OF OPTIMAL PARAMETERS OF EXPLOSIVE DESTRUCTION OF ROCKS | 2004 |
|
RU2275587C1 |
METHOD FOR PERFORMING BLASTING OPERATIONS | 2015 |
|
RU2604074C1 |
METHOD OF EXPLOSIVE ROCKS DESTRUCTION OPTIMAL PARAMETERS DETERMINING TAKING INTO ACCOUNT OF THE PRE-DESTRUCTION ZONE | 2017 |
|
RU2655009C1 |
OPEN DEVELOPMENT METHOD OF COAL BEDS GROUP WITH GROSS EXPLOSIVE LOOSENING OF OVERBURDEN ROCKS | 2015 |
|
RU2593285C1 |
METHOD FOR DRILLING BLASTING OF ROCKS | 2004 |
|
RU2256873C1 |
Authors
Dates
1994-09-15—Published
1990-10-09—Filed