FIELD: transportation of ARMORED concrete slabs. SUBSTANCE: method consists in the following: slabs are removed to stack from base for stress of reinforcement after cutting, further to storehouse by means of two trucks moving on rails between which base is located. At forming the stack slabs are placed on base construction, stack is moved together with it. Device for realization of method has two trucks, each truck is provided with hoisting block relative its frame and with weight means for slabs and base construction. EFFECT: improved efficiency. 8 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
CONVEYER SYSTEM OF TOP LOCATION | 0 |
|
SU1836273A3 |
TIMBER CARRIER TRUCK | 2011 |
|
RU2535969C2 |
METHOD FOR INSULATION OF PIPES, MOSTLY OF OIL AND GAS PIPELINES AND DEVICE FOR INSTALLATION OF INSULATING MEMBERS | 1983 |
|
RU2008548C1 |
DEVICE FOR CONDINUOUS MOULDING OF ARTICLES FROM LOW-PLASTICITY CONCRETE MIXES | 0 |
|
SU1621807A3 |
DEVICE TO CAST CONCRETE ARTICLES | 1985 |
|
RU2031780C1 |
PALLET HOLDER FOR TRANSPORTATION OF CARS | 2013 |
|
RU2564063C2 |
TRUCK LOADING/UNLOADING EQUIPMENT | 0 |
|
SU1189331A3 |
CONTAINER DISPLACEMENT DEVICE | 2000 |
|
RU2268835C2 |
LINE FOR BRICK PRODUCTION | 1995 |
|
RU2054354C1 |
TIMBER DRIVE IN DRYING FURNACE | 2007 |
|
RU2443957C2 |
Authors
Dates
1994-10-15—Published
1991-04-30—Filed